In many environments, the semaphore introduces a wait for each process trying to update the same value, which can delay the execution of the program.
在许多环境中,信号量都给尝试更新相同值的各进程带来了等待时间,这可能会延迟程序的执行。
The duration does not take into account the retry delay, since this is not part of the execution time.
其持续时间没有考虑重试延迟,因为这没有包含在执行时间中。
If a timer is blocked from immediately executing it will be delayed until the next possible point of execution (which will be longer than the desired delay).
如果一个timer在将要执行的时候被阻塞,它将会等待下一个时机(比预期的延时要长)。
Set the name of the cluster database, such as MYDEDB, and click Delay execution of database scripts. Then click next.
设置集群数据库名称,例如MYDEDB,单击Delay executionofdatabasescripts。
This scheduling algorithm can control the execution sequence of subtasks and reduce control input output delay.
该算法能够控制子任务执行顺序和降低控制输入输出延迟。
The Contractor shall commence the execution of the Works as soon as is reasonably practicable after the Commencement Date, and shall then proceed with the Works with due expedition and without delay.
承包商应在开工日期后合理可行的情况下尽快开始实施工程,随后应迅速且毫不拖延地进行施工。
Any delay in the fulfilment of the above-mentioned conditions will oblige the Buyer to compensate the Seller for the additional costs resulting from the suspension of the execution of the Contract.
延迟履行上述条件将使买方有义务赔偿卖方由于中止本合同履行而发生的额外费用。
As far as speed is concerned, you're working with machine code produced by an optimizing compiler. Execution is fast, but you might notice a startup delay as the support DLLs are loaded.
至于速度的问题,你的机器代码已经被编译器最优化了。执行起来很快,但是你可能在程序开始加载dll时感觉到有所延迟。
We apologize for the delay in our execution of the contract .
我们为履行合同时的延误表示道歉。
Abstract: During the execution of the project, schedule delay is always the focus of dispute between the two parties of the contract.
[摘要]项目执行期间的工期延误问题往往成为双方争议的焦点。
The Contractor shall promptly give notice to the Employer of specific probable future events or circumstances which may adversely affect or delay the execution of the Works.
承包商应及时将未来可能对工程施工造成不利影响或延误的事件或情况通知雇主。
Additionally, contention for Managed Objects may cause a timed task to delay its execution.
管理对象的冲突可能导致一个定时任务的延迟执行。
This method is typically not used in conjunction with fixed-delay execution repeating tasks, as their scheduled execution times are allowed to drift over time, and so are not terribly significant.
该方法通常不在固定延迟的执行重复任务的连接中使用,因为它们的执行时间允许超时,所以意义不明显。
This method is typically not used in conjunction with fixed-delay execution repeating tasks, as their scheduled execution times are allowed to drift over time, and so are not terribly significant.
该方法通常不在固定延迟的执行重复任务的连接中使用,因为它们的执行时间允许超时,所以意义不明显。
应用推荐