And financial affairs evaluation in a project seems more important after China joining in WTO and CNPC going on the stock market.
在中国加入WTO、中油股份公司上市之后,进行项目财务评价显得尤为重要。
At present, the post-evaluation index is mainly according to project real data after it finished, and compare with assess the index in earlier stage of the project.
目前对工程项目后评价主要是依据项目完后的实际数据得出相应的指标,并与项目前期评估指标进行对比分析。
They coordinate all aspects of the project and are responsible for follow-up and evaluation after the fact.
他们协调项目的所有方面,并负责跟踪和评估项目运营后的成果。
The evaluation of project management achievements after implementation is very important because the construction management ability has great impact on the competitiveness of contractor.
施工项目管理水平如何,直接影响着施工承包商的竞争力,因此,项目结束后对项目管理成果的评价非常重要。
Secondly, after comparatively analyzing various risk evaluation methods, a risk decision-making model of project development based on Fuzzy Assessment was built.
接着在对比分析各类风险评价方法的基础上,构建了基于模糊综合评价的风险决策模型;
After this safety evaluation, safety classes for each slope project need to be categorized.
经过此次安全评估工作后,应对评估为不同安全等级的防护工程分类采取相应措施。
The after-project profit evaluation of agricultural land consolidation is an important part of the study on the land consolidation theory and practice.
农地整理项目后效益的研究是土地整理理论及实践研究的一个重要组成部分。
The prize and the design compensation of this project shall be paid within 30 business days after the sponsor has published the evaluation result officially;
本次招标的奖金及设计成本补偿费将在主办方正式公布评审结果后30个工作日内支付;
Therefore, the power transmission project after the evaluation has a very real necessity.
因此,对输变电工程进行后评价有着十分现实的必要性。
After a brief comparison of several current major evaluation methods, it put forward a complete and detailed method for public buildings which can be used in project.
在简要对比几种现行的主要评估方法后,提出一套完整、详细的性能化动态评估方法。
After the analysis, the dissertation summarizes single and comprehensive post-evaluation method of port construction project.
通过分析,归纳总结出港口建设项目单项和综合后评价方法。
After established the evaluation index system, this article established the project orientation decision-making model which based on fuzzy comprehensive evaluation.
指标体系确定后,基于模糊综合评判建立了商业地产项目定位决策模型。
After nearly two years of effort, the project has recently passed the evaluation successfully and come into a conclusion.
经过近两年的努力,课题已于近日顺利通过评审,结题付梓。
After nearly two years of effort, the project has recently passed the evaluation successfully and come into a conclusion.
经过近两年的努力,课题已于近日顺利通过评审,结题付梓。
应用推荐