• Estimating and planning development resources, schedules, and skill levels based on application quality requirements.

    估算策划开发资源工作进度以及基于应用软件质量要求技术水平

    youdao

  • Planning, estimating, and tracking the progress of your portal project is not a new concept.

    计划评估跟踪门户项目进度并非一个概念

    youdao

  • According to objective analysis, 48% of projects fail because of bad planning and estimating.

    根据客观分析,48%失败项目是因为计划评估不当造成的。

    youdao

  • People end up with lots of questions like: How are you going to handle planning and estimating?

    人们最终许多这样问题你们怎样计划评估

    youdao

  • For technical leaders, project planning, estimating, and tracking are required in addition to having strong technical and technical leadership skills.

    对于技术负责人除了具备很强的技术技术领导技能外,还必须进行项目计划评估跟踪

    youdao

  • The planning and estimating helps the team decide how much work will fit into the sprint.

    规划估计可以帮助团队决定满足Sprint需求需要多大的工作量。

    youdao

  • Most software engineering texts spend some amount of copy on project planning and estimating, including tools like the Constructive Cost Model (COCOMO).

    大多数软件工程学课本都花费篇幅介绍项目计划估计包括类似ConstructiveCostModel (COCOMO) 5这样的工具

    youdao

  • Planning and estimating is basically a mechanism for first determining that the project is worth doing and later as an approach for keeping the project on track.

    计划以及预估基本上这样机制首先决定项目值得去做然后作为方案保持项目始终处于轨道中。

    youdao

  • Iterative development is sometimes said to operate on such short time scales that there is no need for planning and estimating.

    迭代化开发有时认为短的时间上执行以至于需要进行计划制定预估。

    youdao

  • In agile teams this is generally reflected in the use of planning poker and a focus on estimating by feature rather than task.

    敏捷团队中,通常反映规划扑克使用关注功能估算不是任务估算上。

    youdao

  • The skill of planning can't be underestimated, and neither can estimating!

    计划能力不可低估,也不可被估量。

    youdao

  • The most effective equipment, manpower planning and estimating tool you can own!

    有效设备人力规划估算工具可以自己

    youdao

  • Scale Master II makes it easy to do Linear, Area and Volume take-offs with speed, accuracy and confidence when estimating, bidding or planning.

    规模硕士容易线性面积体积起飞速度准确性信心估计投标规划。

    youdao

  • Our major planning items contain estimating of cost and construction schedule.

    我们主要计划工作项目包括费用预算施工进度

    youdao

  • Project cost Management includes the processes involved in planning, estimating, budgeting, and controlling costs so that the project can be completed within the approved budget.

    项目成本管理包括成本计划、成本估算、成本预算成本控制相关过程,用以确保项目核准预算内完成

    youdao

  • Courses include site planning, construction surveying, building systems drafting, technical writing, estimating, and related subjects.

    课程平面设计施工测量建筑系统拟草专业写作估计能力相关学科

    youdao

  • Conclusion the lung injury range of paraquat poisoning patients seen on the initial CT images can provide the reference evidence for estimating the prognosis and planning the therapeutic protocol.

    结论百草中毒首诊时肺部损害范围对于判断预后提供治疗方案具有显著指导意义。

    youdao

  • Conclusion the lung injury range of paraquat poisoning patients seen on the initial CT images can provide the reference evidence for estimating the prognosis and planning the therapeutic protocol.

    结论百草中毒首诊时肺部损害范围对于判断预后提供治疗方案具有显著指导意义。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定