Management neglects to properly estimate the time needed to formulate the n-tier strategy conversion and the time for the product development team to become familiar with the n-tier technologies.
管理层没有正确估计实现n 层架构转换所需的时间和产品开发团队熟悉 n 层技术所需的时间。
Then the N state estimates, each of which is weighted by its possibility that is also calculated on-line, are combined to form a optimal estimate.
然后,对这N个状态估计值进行概率加权求和,得到最优状态估计值。
Based on the research of normalization of SPT -n, a method to estimate the relative density of normally consolidated sandy soils is proposed.
在介绍标准贯入N值归一化研究成果的基础上,提出了用归一化标准贯入N值估算正常固结砂土相对密度的方法。
Based on the research of normalization of SPT -n, a method to estimate the relative density of normally consolidated sandy soils is proposed.
在介绍标准贯入N值归一化研究成果的基础上,提出了用归一化标准贯入N值估算正常固结砂土相对密度的方法。
应用推荐