Cable erection, base station maintenance... 60 players competitive provincial capital.
架设光缆、基站维护……60名选手省城竞技。
Hauling system is key equipment in the main cable erection of suspension bridge. It is a complex system which consist of many kinds of mechanic and the operators.
牵引系统是悬索桥主缆架设施工的关键设备,它是多种机械设备与操作人员组成的一个复杂的大系统。
After the erection of cable tray and the supports, the welding points and supports should be painted, and the final paint for them should be of the color to the self-color of the tray.
桥架及其支架等安装完毕后,对焊点和支架要进行防腐处理,并喷涂一层和桥架本色相同的面漆。
Since the novel cable with low line loss is very expensive, the erection must strengthen the measures for resisting natural hazards and reduce bending points and bypasses.
因为新型低线损的电缆很昂贵,架设必须强化抗御自然灾害的措施和减少弯曲、绕道。
This paper mainly introduces the cable erection construction experience and the key control points of main span arch boxes of Wentanghe Extra Large Bridge on Chongqing-Linshui Expressway.
主要介绍了渝邻高速公路温塘河特大桥主跨拱箱缆索吊装的施工经验及控制要点。
In addition, the strands will be loaded unevenly because of the error of the main cable wire manufacture and erection, and the structural reasons of structure itself.
此外,由于主缆丝股制造和架设长度的误差及结构本身构造的原因也会使丝股之间发生应力不均匀现象。
The method of measurement and data analysis of temperature of the main cable during the erection of suspension bridges are presented.
介绍悬索桥架设期间主缆温度测试的方法和数据分析,并以我国两座悬索桥——汕头海湾桥和西陵长江大桥为例予以阐述。
Furthermore, the analysis and discussion have been done on the problem of making an active correction to the formwork erection elevation of the main beam and cable force.
并对主梁立模标高和斜拉索的张拉索力的主动修正问题进行了分析和讨论。
Furthermore, the analysis and discussion have been done on the problem of making an active correction to the formwork erection elevation of the main beam and cable force.
并对主梁立模标高和斜拉索的张拉索力的主动修正问题进行了分析和讨论。