It is found that engineering contract losses are currently widely used international EPC contract mode.
研究发现,亏损的工程承包合同均为目前国际上广泛使用的EPC合同模式。
Abstract: Based on the transaction cost theory, establish the EPC contract mode and the traditional mode transaction cost model, and make a comparative analysis.
以交易成本理论为基础,建立EPC总承包模式与传统模式的交易成本模型,并进行对比分析。
Abstract: Based on the transaction cost theory, establish the EPC contract mode and the traditional mode transaction cost model, and make a comparative analysis.
[摘要]以交易成本理论为基础,建立EPC总承包模式与传统模式的交易成本模型,并进行对比分析。
The main disputes, disputes alert and settlement in EPC contract are analyzed in this thesis, with the purpose to reduce The Times disputes happening and lost caused by disputes.
本文对EPC总承包合同的争端进行分析,研究了EPC争端的预警和解决程序,目的是减少EPC合同争端的发生次数,降低争端带来的损失。
Since our country joined in the WTO, our building trade is taken more in line with international practice, and the EPC contract will be more and more extensively used in our country.
但是随着我国加入WTO,我国建筑业与国际接轨的步伐加快,EPC在国内建设项目的应用越来越广泛。
For the above reasons, based on EPC contract clause 13.16, adjusted for our expansion project of the East Sewage labor costs, adjustments to the policy document provides for the rate.
基于以上原因,依据EPC合同第13.16条规定,我方申请调整东污水扩建工程的人工费,调整幅度为政策文件规定的幅度。
Analysis from the characteristics of EPC conditions of contract, focuses on the risk identification and prevention of the contractor, for the reference of Chinese engineering contracting business.
本文从EPC合同条件自身特点进行分析,重点讨论承包商的风险识别与防范问题,供我国工程承包企业参考。
Compared with the conditions of construction contract of EPC mode and the traditional mode, risk allocation principles are very different.
EPC合同模式与传统的施工合同条件模式相比,风险分配原则有很大的不同。
Abstract: Bidding quotation risk of international power engineering EPC overall contract project has received great attention in a long time.
[摘要]海外发电EPC总承包项目投标报价阶段的风险一直是各界关注的焦点。
In recent years, the engineering contract business of China Metallurgical coke-resistant develops rapidly, and gradually forms a design as the main body to EPC-based operating structure.
近年来,中冶焦耐的工程总承包业务迅猛发展,逐步形成了以工程设计为主体,以工程总承包为主业的经营格局。
In such background condition, risk management process and risk management method of the EPC general contract are studied systematically in this paper.
在这样的背景下,本文对EPC总承包模式的风险管理过程及风险管理方法进行了系统研究。
With the development of EPC project prime contract, it is applied more and more widely in the domestic construction project.
随着我国大规模基础设施工程的建设,EPC总承包模式将逐步被应用于公路项目建设方面。
Finally, puts forward the corresponding coping strategies for the risks and problems existing in cost management, which provide advice for enterprises which contract overseas railway EPC projects.
最后针对成本管理存在的风险及问题提出相应的应对策略,为承揽境外铁路EPC项目的企业提供成本管理方面的参考建议。
Finally, puts forward the corresponding coping strategies for the risks and problems existing in cost management, which provide advice for enterprises which contract overseas railway EPC projects.
最后针对成本管理存在的风险及问题提出相应的应对策略,为承揽境外铁路EPC项目的企业提供成本管理方面的参考建议。