I class professional design of environmental project issued by Ministry of Construction of P. R. China Since 1997.
1997年获得国家建设部首批颁发的环境污染防治专项工程设计甲级资质证书;
College degree, major in environmental project, industrial hygiene or relevant specialties, experience in chemical industry preferred.
大学文凭和学位,环境工程、工业卫生或相关专业,有化工工作背景者优先。
This paper emphasizes on basic methods of decision making on environmental investment, and analyses the decisions on environmental project by case study.
其中着重介绍了环境投资决策的基本方法,并举实例对环境项目的决策进行分析。
The first ICI environmental project was a result of the realization, as a major play in the chemicals industry, ICI would have to address these growing public concerns.
帝国化学工业公司的第一个项目是基于这样的认识:作为化工工业的主力,帝国公司应该处理这些公众日益关注的问题。
Build environmental project how issue is it reach of both sides equilibrium of interests to bear risk by way of bot, how to evade to make the environmental project benefit greatest etc.
以BOT方式建设环境工程中的风险问题如何承担才能达到双方利益的均衡,如何规避才能使环境工程效益最大等等。
The real estate development of operating costs include a variety of factors, influencing factors and environmental project decision-making period, construction and organizational structure, etc.
房地产开发的营运成本包括很多种,影响成本的因素有项目决策、环境因素、工期建设和组织构架等。
The Hungarians backed out of the project in 1989 on environmental grounds.
匈牙利人在1989年以环境问题为由退出了该项目。
Nick Perks, project director for Climate Solidarity, believes this sort of activity is where the future of environmental action lies.
气候团结组织的项目主管尼克·珀克斯相信这类活动是环保行动的未来所在。
Another Rosebud project is an environmental study; the American burying beetle is of special concern.
罗思·巴德的另一个项目是一份环境调查,特别关注了美国的埋葬甲虫。
But refactoring also encompasses environmental factors for your project.
但是重构也包含项目的环境因素。
But they project that before the next full moon, they will need the help of middle-schoolers across the country to understand an impending environmental disaster, secrets that they alone can uncover.
但是他们表示在下一个满月之前,将需要全国的中学生来帮助他们理解即将发生的环境灾难,这个秘密是他自行可以揭开的。
Due to the controversial nature of the program, U.S. and German officials deemed to present it to the public as a civilian project with environmental aims.
由于这个项目的争议性,美国和德国官员据信在向公众介绍这个项目时会把它说成一个带有环保目的的民用项目。
Critics feared that the massive project would create a string of ecological, environmental and social problems.
批评人士担心,如此大规模的项目将会带来一系列的生态、环境和社会问题。
Doucet says no people live in the valley and whatever the environmental costs, these would be offset by the benefits of the project.
世界能源理事会的杜斯特秘书长说,这个山谷中没有居民,而且无论这项工程的环境成本有多高,都能被工程的益处所抵消。
Environmental assessments are processes which aim to integrate environmental, social and economic concerns into project planning, design and implementation.
环境评估是旨在把环境、社会和经济考虑纳入项目规划、设计和实施的过程。
The PBDE study was part of a decade-long project by the UC Berkeley scientists to examine whether environmental factors are harming the health of Salinas Valley mothers and children.
伯克利大学的科学家们在进行一项长达十年的研究,即环境是否对萨利纳斯山谷里的妇女及其孩子身体造成伤害的因素。
However, the project had been highly controversial, largely because of the environmental damage it would cause and the thousands of people who would have needed to be displaced to build the dam.
然而,该工程备受争议,很大程度上是由于它将引起的环境破坏以及为了建设大坝而需搬离的数千民众。
For example, the developer of a dam for a hydroelectric project is committed to funding environmental management in protected areas within the affected watershed.
例如,一个大型水坝开发商承诺,为受影响的流域内的保护区的环境管理工作提供资助。
The project, aimed at building support facilities for the Hainan International Conference and Exposition Center, has passed the ocean environmental impact evaluation.
该工程是海南国际会展中心的配套项目之一,已经通过海洋环境影响评估。
The project aims to help improve environmental conditions in Liuzhou by improving wastewater treatment, industrial pollution control, municipal sanitation and solid waste services and management.
本项目旨在通过加强污水处理、工业污染控制、改善城市环境卫生以及加强固体废物服务与管理,从而改善柳州市的环境状况。
Utilities and environmental groups from Springfield and Hamilton are in the process of initiating the same project in their communities.
斯普林菲尔德和汉密尔顿等城市的公用事业及环保团体目前都在积极推动该项目在居民社区内进行普及。
A 2005 evaluation of this project showed dramatic environmental and social changes.
2005年对项目所作的评价表明项目带来了巨大的环境和社会变化。
"We actually have a list of the known named species," says Jesse Ausubel, co-founder of the census project and an environmental scientist at the Alfred P. Sloan Foundation.
的共同创始人,“我们实际上已拥有一个已知生物的目录。”这听起来非常基础,但是他指出,当海洋生物普查项目在。
The department of planning shall not ratify the design plan descriptions of the construction project until after the environmental impact statement on the construction project is approved.
环境影响报告书经批准后,计划部门方可批准建设项目设计任务书。
The department of planning shall not ratify the design plan descriptions of the construction project until after the environmental impact statement on the construction project is approved.
环境影响报告书经批准后,计划部门方可批准建设项目设计任务书。
应用推荐