• The application of detailed estimate norm in engineering quantity list quotation in the transitional period;

    阐述了地方定额预算软件系统的设计及所采用的技术。

    youdao

  • In engineering quantity list bidding, making good use of aggregative unit price can bring notable economic profit.

    在工程量清单投标中,灵活运用综合单价会给投标单位带来显著的经济效益。

    youdao

  • With the entry to the WTO, valuation of construction engineering in China is converging to-ward the international mainstream, adopting valuation based on engineering quantity list.

    随着我国加入世界贸易组织,建设工程计价与国际接轨,全面实行工程量清单计价已是大势所趋。

    youdao

  • Change is outside the list of engineering quantity; supplied engineering geology datum and hydro-geological data don't agree with practical condition.

    不属于工程量清单范围内的变化,提供的工程地质资料、水文地质资料与实际不符而增加的工程量。

    youdao

  • Through engineering practice introduce concept of engineering quantity det ailed list expound how to use engineering quantity detailed list.

    本文通过笔者的工程实践,介绍了工程量清单的概念,论述了使用工程量清单招投标的程序。

    youdao

  • Through engineering practice, introduce concept of engineering quantity det ailed list, expound how to use engineering quantity detailed list.

    本文通过笔者的工程实践,介绍了工程量清单的概念,论述了使用工程量清单招投标的程序。

    youdao

  • Abstract:First, based on the incomplete contract theory, summarizes the main factors of difference of quantities that including the engineering change, List missing item and quantity deviation.

    摘要:首先,基于不完全契约理论,总结引起工程量差异的工程量清单缺项、工程变更等主要因素;

    youdao

  • Abstract:First, based on the incomplete contract theory, summarizes the main factors of difference of quantities that including the engineering change, List missing item and quantity deviation.

    摘要:首先,基于不完全契约理论,总结引起工程量差异的工程量清单缺项、工程变更等主要因素;

    youdao