In different engineering geological conditions, the construction process, the migration of overlying strata have different rules.
在不同工程地质条件下,施工过程中覆岩具有不同的运移规律。
This paper deals with three factors, i. e. topographic unit, stratigraphic age, and strata association as the most important elements for controlling the soil engineering geological conditions.
本文以地貌单元、地层时代和地层组合作为控制土体工程地质条件的基本要素,并从八个方面实例论证了这三大要素对各类土体工程地质条件的宏观控制作用。
This paper deals with three factors, i. e. topographic unit, stratigraphic age, and strata association as the most important elements for controlling the soil engineering geological conditions.
本文以地貌单元、地层时代和地层组合作为控制土体工程地质条件的基本要素,并从八个方面实例论证了这三大要素对各类土体工程地质条件的宏观控制作用。
应用推荐