• Chrome has already met the goal the browser's engineering director set a year ago when he said Chrome would own 5% of the market by September 2010, and 10% by September 2011.

    Chrome已经实现了浏览器产品工程总监一年前预期的目标,他希望Chrome到2010年9月两周岁时拥有5%左右的市场份额,到2011年9月三周岁时达到10%左右的市场份额。

    youdao

  • He directly reports to the Maintenance and Engineering Director.

    他直接向维修和工程总监汇报。

    youdao

  • Engineering Director, Google Security Team, is responsible for protecting the security of users, customers, staff, and systems.

    Google安全小组工程主管,负责保护各用户、客户、员工以及系统的安全。

    youdao

  • Get formal approval of the manager's new job description from his or her manager (for example, the Engineering Director, or department head).

    得到他或她的经理(比如,工程总监或是部门主管)对新的工作描述的正式批准。

    youdao

  • With either of these approaches, it is critical to get formal approval of the manager's new job description from his or her manager (for example, the Engineering Director, or department head).

    使用任何这些方法,最关键的是得到他或她的经理(比如,工程总监或是部门主管)对新的工作描述的正式批准。

    youdao

  • PSG Engineering Director is responsible for controls of Code documents within PSG Engineering Department.

    管架集团(PSG)工程部的内部规范文件,由管架集团(PSG)工程总监负责控制。

    youdao

  • Documentary evidence to demonstrate the above will be submitted by the RPE for review by the PSG Engineering Director.

    注册专业工程师必须提交上述事项的书面证明文件,由管架集团(PSG)工程总监对所提交的书面文件进行评审。

    youdao

  • The above documents which are uniquely identified are prepared by a design engineer designated by the Engineering Director.

    上述文件采用唯一识别号,并由工程总监指定设计工程师编制。

    youdao

  • This status report is reviewed by NQA Engineer and the PSG Engineering Director is advised regarding the status of all registered code documents.

    该状态报告由核质量保证工程师(NQA)负责评审,所有登记在册规范文件的状态应通知管架集团(psg)的工程总监。

    youdao

  • Review of the results will be performed by a Design engineer and decisions regarding modification to standard load group loadings will be determined by the PSG Engineering Director.

    设计工程师负责对分析结果进行评审。按照标准载荷组载荷要求,对载荷进行调整的相关事宜,由管架集团工程总监作出最终决定。

    youdao

  • Review of the results will be performed by a Design engineer and decisions regarding modification to standard load group loadings will be determined by the PSG Engineering Director.

    设计工程师负责对分析结果进行评审。按照标准载荷组载荷要求,对载荷进行调整的相关事宜,由管架集团工程总监作出最终决定。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定