This paper focuses on the construction process of engineering cost control and management of its function discussed.
本文主要对工程建设过程中工程造价控制和管理工作对其起到的作用进行了探讨。
At present, the control of manpower responsibility cost is a difficult point of enterprise cost management and control in the construction of railway engineering projects.
目前铁路工程建设施工中人工责任成本的控制是企业成本管理与控制的难点。
They are designed to provide advisory services, project cost control, engineering and equipment, material bidding. project management consultancy services.
为所服务项目提供设计咨询,工程成本控制,工程及设备、材料招投标,工程项目管理等顾问服务。
This paper discusses the cost control methods of highway engineering, and analyzed the significance of the project cost management and specific measures of cost management.
本文论述了公路工程成本的控制方法,并着重分析了工程成本管理的意义和成本管理的具体措施。
How to apply plan management, process management, control of cost of software engineering are studied in the middle and small software development enterprises.
研究了软件工程项目计划管理、项目进度管理、成本控制技术在中小软件开发企业中如何应用。
Management of objective cost, cost function analysis by means of the value engineering and general method realization of objective cost control for new product development are presented.
介绍了目标成本管理、运用价值工程进行成本功能分析及实现新产品开发目标成本控制的一般方法。
It systematically presents the influencing factors of the engineering cost during the stage of construction, and illuminates the management and control methods of the engineering cost.
系统地介绍了施工阶段影响公路工程造价的各种因素,阐明了工程造价管理与控制的方法及措施。
The commonly used methods of cost control are the PDCA management cycling method and the value engineering method.
成本费用控制常用的方法为PDCA管理循环法、价值工程法。
Strengthening the cost management and control of engineering project is an inevitable path of increasing the competitive power of the construction enterprise.
加强工程项目成本管理与控制,是增强施工企业竞争力的必然途径。
The engineering cost control is the core of construction management, It runs through the whole process of construction and includes the determination, control and management of the construction cost.
工程造价控制是建设管理的一个核心部分,它始终贯穿于工程建设的全过程,即体现在对工程建设设计、施工再到竣工交付使用前所需全部建设费用的确定、控制、管理。
The total process control of engineering cost management is discussed by three stages of investment decision, design and construction.
本文结合工程造价管理经验,从投资决策阶段、设计阶段、施工阶段阐述了如何对工程造价进行全过程控制。
The office automated system basing on knowledge management developed with software engineering theory will well control the software development progress, cost and quality, and get proper outputs.
利用软件工程理论开发基于知识管理的办公自动化系统,能够很好的保障软件开发的进度、成本和质量,得到满足用户需求的软件产品。
Hydropower station construction engineering possesses long-term construction and huge investment character, thus engineering cost control management becomes an important problem.
因此工程造价控制管理成为工程建设中重要的环节。
The control and management of engineering cost is a dynamic process.
工程造价的控制与管理是一个动态的过程。
This paper discusses the management of engineering cost, analyzes the method to control engineering cost from different aspect, and states how to control engineering cost in reason.
本文对工程造价管理角度进行了论述,从不同的角度分析了控制工程造价的方法,阐明如何科学地控制工程造价。
This paper discusses the management of engineering cost, analyzes the method to control engineering cost from different aspect, and states how to control engineering cost in reason.
本文对工程造价管理角度进行了论述,从不同的角度分析了控制工程造价的方法,阐明如何科学地控制工程造价。