• Built and maintain BOM (bill of material) for new product and update it in case of engineering change or other requirement by related dept.

    进行新产品BOM(物料清单)表的建立与维护,根据工程变更或相关部门要求进行更新。

    youdao

  • The BOM is the ligament that contacts the engineering design and production control.

    BOM是联系工程设计和生产管理的纽带。

    youdao

  • Creation of 2D/3D drawings, BOM and other design related documents, communicate with FTE German engineering centers to facilitate detailed design and drawing creation.

    建立二维/三维图纸,产品零件清单及其它与设计相关的文件,与FTE德国总部的工程师中心进行详细的设计和图纸创建方面的沟通。

    youdao

  • Creation of 2D/3D drawings, BOM and other design related documents, communicate with FTE German engineering centers to facilitate detailed design and drawing creation.

    建立二维/三维图纸,产品零件清单及其它与设计相关的文件,与FTE德国总部的工程师中心进行详细的设计和图纸创建方面的沟通。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定