The most comprehensive trend analysis technique is the Earned Value method.
挣值分析方法是最广泛使用的动态分析技术。
Abstract: The traditional Earned Value Method(EVM) is mostly used at the condition of BOQ.
传统挣值法主要适用于工程量清单合同条件下施工单位项目管理活动。
The paper concludes that earned value method can be applied in the analysis of the total cost variance in land development and consolidation projects.
研究结论:挣值法可运用于土地开发整理工程成本偏差分析。
But the important means to achieve these two objectives at the same time is the Earned Value Method which is mean of project cost and schedule co-ordinate control.
而同时实现这两个目标的重要手段就是通过挣值法对工程项目费用与进度进行协调控制。
This thesis introduced Function Point into the measurement of the work performed, and constructed the amendatory earned value method for software project based on Function Point.
本文提出将功能点方法引入到软件项目实际产出成果的度量,构筑了基于功能点方法的软件项目挣值分析方法。
It corrects the deviation derived from traditional earned value method when forecasting the duration and cost, and it supplies more analysis information than traditional earned value method.
该方法能改进传统挣值法在预测工期、成本方面产生的偏差,并且与传统挣值方法相比,增加了更多的原因分析信息。
As a management way in modern project management, the method of earned value analysis plays an important role in time management and cost management.
挣得值分析法作为现代项目管理的一种管理方法,在项目进度管理和费用管理中具有重要作用。
The Earned Value Management is practical and has a wide prospect on weapon equipment development, but the limitation of the method is obvious.
指出了挣值管理方法是一种很有实际意义的项目管理方法,在武器装备研发项目中有着广阔的应用前景。
The results show that earned value project management method can make integrated management of logistics cost, and provide a basis for better grasping and controlling the project operating conditions.
研究表明,挣值管理方法能够对项目物流成本进行集成管理,它为管理者更好地掌握和控制项目运行状况提供了决策依据。
We propose a dynamic forecasting model based on the improved effective model of earned value management by the fuzzy comprehensive assessment and quantitative method.
在改良的挣值管理有效模型的基础之上,采用层次模糊综合评判和数量化分析方法提出了挣值管理动态预测模型。
We propose a dynamic forecasting model based on the improved effective model of earned value management by the fuzzy comprehensive assessment and quantitative method.
在改良的挣值管理有效模型的基础之上,采用层次模糊综合评判和数量化分析方法提出了挣值管理动态预测模型。