• The earned value management methodology also provides a means to forecast future performance based upon past performance.

    实现价值管理技术的方法还是根据过去的实施结果预测未来绩效一种手段

    youdao

  • As schedule and cost is managed synthetically in project, earned value concept played an important role in construction project management.

    赢得原理作为工程项目进度成本综合管理,对施工项目管理起着不可忽视的作用

    youdao

  • As a management way in modern project management, the method of earned value analysis plays an important role in time management and cost management.

    挣得分析法作为现代项目管理一种管理方法项目进度管理费用管理中具有重要作用

    youdao

  • The paper analyses the work process of earned value management, whose review index and evaluation means are probed into.

    本文分析赢得管理工作流程,探讨了赢得值管理测评指标测评方法

    youdao

  • We have known about some foreign advanced construction project management during my postgraduate studying, which Earned Value management (EVM) is one of them.

    研究生阶段学习当中我们接触到一些国外先进工程项目管理方法,其中赢得管理方法就是其中之一

    youdao

  • Finally, an engineering project application case is analyzed to illustrate the whole process of Earned Value management based on the reward and penalty system of time and the critical path.

    最后本文通过一个工程项目案例具体演示基于工期奖罚制度关键路径管理使用过程

    youdao

  • To solve this problem, earned value management is created, and it is a effective project management technique for monitoring cost and schedule and improving project performance.

    针对一问题管理便应运而生了,改善项目绩效、预警成本进度超支的有效项目管理技术

    youdao

  • Furthermore, earned value management system is introduced to monitor and control multiple projects for PBOs. Earned value maturity model is analyzed at the end of this part.

    然后管理系统概念应用项目型组织项目绩效监测控制中,分析了挣值管理成熟度模型

    youdao

  • The paper analyzes the application scope; earned value calculation, cost prediction of earned value management in overseas oil exploration and development of project cost control project.

    海外石油勘探开发项目成本控制管理适用范围、挣值计算、成本预测等进行了分析

    youdao

  • The results show that earned value project management method can make integrated management of logistics cost, and provide a basis for better grasping and controlling the project operating conditions.

    研究表明,管理方法能够项目物流成本进行集成管理,管理者更好地掌握控制项目运行状况提供决策依据

    youdao

  • In our country, knowing and understanding earned value management begins with the cooperation with international engineering company of the 1990s.

    我国,对管理认识了解开始于90年代国际工程公司合作

    youdao

  • This paper elaborated the comprehensive analysis and control progress on the cost by earned value management which means analyzing and controlling the budget and actual costs.

    文章详细阐述了法进行费用进度综合分析控制对已完工作预算费用、计划工作预算费用已完工作实际费用的分析与控制。

    youdao

  • The Earned Value Management is practical and has a wide prospect on weapon equipment development, but the limitation of the method is obvious.

    指出管理方法一种很实际意义的项目管理方法,武器装备研发项目中有着广阔应用前景。

    youdao

  • We propose a dynamic forecasting model based on the improved effective model of earned value management by the fuzzy comprehensive assessment and quantitative method.

    改良管理有效模型基础之上,采用层次模糊综合评判和数量化分析方法提出了挣值管理动态预测模型。

    youdao

  • Project earned value management is the most effective co-ordinate control methods of cost and schedule by far, but our research on the earned value management is still very limited.

    项目管理迄今为止最有成效一种进度费用协调控制方法然而我国挣值管理研究有限。

    youdao

  • In addition, the selected contractor will provide classroom and on-the-job training to program management personnel in the interpretation and use of earned value management data.

    此外选定承包商项目管理人员提供课堂在职培训,介绍管理数据的理论应用

    youdao

  • Construction project as complex processes, resources, demand-side characteristics of widely used Earned Value Management will highlight the significant advantages.

    施工项目因为工序复杂资源需求广特点采用管理法更突出明显优势

    youdao

  • Construction project as complex processes, resources, demand-side characteristics of widely used Earned Value Management will highlight the significant advantages.

    施工项目因为工序复杂资源需求广特点采用管理法更突出明显优势

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定