Solving a dynamic programming problem of a central planner can prove that the competitive equilibrium and the social optimum is identical.
随后又从中央计划者角度求解一个动态最优化问题,发现社会最优和竞争性均衡是一致的。
It combines an interface and a programming language into a dynamic tool for both numerical and symbolic problem solving.
它在一个动态工具中组合了界面和编程语言,可同时用于数字和符号问题的解答。
But dynamic programming is usually applied to optimization problems like the rest of this article's examples, rather than to problems like the Fibonacci problem.
但是动态编程通常被用于最优化问题(比如本文后面的示例),而不是像斐波纳契数这样的问题。
This is about 01 knapsack problem dynamic programming algorithm.
这是关于01背包问题的动态规划算法。
The problem can be solved by using dynamic programming state-space relaxation.
该问题清晰化后可利用动态规划状态空间松弛来求解。
This method combined the ameliorated grid degenerate and dynamic programming, it can solve the problem of time delay in path planning with sudden appearing threats.
提出采用一种结合三角网格退化、变域动态规划以及航迹优化的方法来解决突发威胁下的航迹规划问题。
With the help of dynamic programming method, the multistage decision problem on surface water and groundwater is analysed in this paper.
本文借助动态规划理论,分析了地表水与地下水统筹管理的多阶段决策问题。
One dimension resources distribution problem is a typical example in the application of dynamic programming, and state variable is an important factor in constructing dynamic programming model.
一维资源分配问题是动态规划应用的一个典型例子,在建立动态规划模型时,状态变量是一个重要的因素。
The steps of continuous differential dynamic programming were established for this optimal control problem.
建立了求解最优控制问题的连续微分动态规划算法步骤。
At present, the main way to solve this problem is dynamic programming method and martingale method.
目前解决这一问题的主要方法是动态规划和鞅方法。
It is easily shown that this problem is NP-hard, and a dynamic programming algorithm and a branch-and-bound algorithm are developed to solve it optimally.
文中简单说明此问题为NP -难问题,并提出了一种动态规划算法和一种分枝定界算法来求得此问题的最优解。
This thesis deals with how to solve this type of schedule problem in dynamic programming.
现在研究如何用动态规划方法求解这类排序问题。
Owing to its special structure. the nonlinear programming problem can be considered as a multistage decision problem and solved by using dynamic programming principle.
由于所研究的非线性规划问题的特殊结构,所以可将它看成是一个多阶段决策问题,应用动态规划求解。
This paper is to introduce another solution to operation method expressed in tables of transportation problem with the knowledge of Gaussian elimination and dynamic programming.
用高斯消去法和动态规划的知识介绍对运输问题表上作业法的另一种解法。
This paper presents a solution to the problem of "static" programming by means of dynamic programming in the problem of assigning resources and an example has been given.
本文主要给出一类“静态”规划-资源分配问题的动态规划解法,同时为了说明动态解法在解决静态规划问题中的优越性,给出了一个实例。
So when you're trying to think about is this a problem that I can solve with dynamic programming, these are the two questions you ask.
所以当你想知道能否,用动态编程来解决这个问题时,你可以问自己两个问题。
Taking the pump station of West-South Oil Product pipeline as an example, dynamic programming theory is adopted to settle pump running problem of the whole pipeline with speed variable pumps.
以西南成品油管道泵站为例,运用动态规划的原理,解决配有调速泵的管道全线开泵方案问题。
Based on the theories of dynamic programming, an optimum method has been worked out in this paper to solved the problem for water level control of main drainage channel and an example has been given.
本文应用动态规划理论,探讨了一个解决排水干道水位控制优化问题的方法,并附有计算实例。
It is a key problem to study the fuzzy optimizing multi-dimensional dynamic programming model for water resources systems.
水资源系统模糊优化多维动态规划模型是水资源系统优化研究中的一个重要课题。
The last respect is concerned with the combination of the featurebridging mode method with dynamic programming to reduce the problem of globalimage matching into one of finding the optimal path.
后者是将跨接法与动态规划相结合,将整体影象匹配归结为求解最优路径问题。
GTSP is changed into multi-segment map problem which is solved with dynamic programming algorithm by individual coding.
通过个体编码方法,将GTSP转化为多段图最短路径问题,采用动态规划算法求解;
This paper deals with a particular variety dynamic programming with multi phases and a method resolving this problem is given in this paper.
研究一类多阶段动态规划问题,给出了求最优解的方法。
A mathematical model based on dynamic programming to solve this problem is presented.
提出了一种运用动态规划法来解决虚拟企业制造伙伴选择问题的数学模型。
Note that when you're calculating the next row of the table in the dynamic programming solution to solve the LCS problem, you only need the previous row and your current row.
请注意,当你计算下一行的表动态规划解决方案解决LCS问题,你只需要前面的行和你当前的行。
The network(planning)is an approach applying the longest route problem and its solution of the directed graph in the graph theory to scheduling, and it's also one of the dynamic programming approach.
网络(计划)分析是图论中有向图的最长路线问题及其解法用于计划编制的一种方法,也是动态规划的方法之一。
This thesis applies dynamic programming principle to solve a nonlinear programming problem.
应用动态规划原理来解决一类非线性规划问题。
This paper presents a new mathematical model and algorithm based on dynamic programming and searching method for solving daily economic operation problem on the cascaded hydroelectric power stations.
提出一种应用搜索法、动态规划法实现梯级水电站日经济运行的数学模型和算法。
The FADM algorithm transforms the traditional multiple goods auction into an integer 0/1 knapsack problem, whereby the optimal clearing vector can be found with dynamic programming.
FADM算法将传统的多物品拍卖问题转化为整数型0/1背包问题,从而可用动态规划寻求最佳的出清向量;
This paper alternates dynamic programming, financial engineering and financial mathematics, and explains problem with models and graphics.
文中交替使用了动态规划方法、金融工程分析方法和金融数学方法。
This paper alternates dynamic programming, financial engineering and financial mathematics, and explains problem with models and graphics.
文中交替使用了动态规划方法、金融工程分析方法和金融数学方法。
应用推荐