But the Angle method could not satisfy dealing with the interfaces in the construction projects for the larger scale of the projects and dynamic changes in the implementation process.
但是由于建设项目规模较大,且实施过程的动态变化,单一的方法难以满足界面问题的解决。
Channel construction is a dynamic process and a high-risk project.
渠道建设是一个动态的过程,是高风险的项目。
The management and control of cost for a construction project are a dynamic process.
工程造价的控制与管理是一个动态的过程。
Changing construction is a dynamic management process and the key point for project control is the constructor.
工程变更管理是一个动态管理过程,这一过程控制的关键在于建设单位。
The culture carrier of moral education refers to the meaning of looking the culture as a carrier and a dynamic process and involving the content of moral education in culture construction.
德育的文化载体是指以文化为载体之意,将文化看作是一个动态过程,把德育的内容寓于文化建设之中。
Finally, based on the digitalization management platform and computer, we fulfill the dynamic data collection, treatment, analysis and decision in construction process.
最后,以数字化管理平台为基础,计算机为辅助工具对施工过程实现动态数据的收集、处理、分析和决策。
The building of information monitoring platform system has realized dynamic and fine management in the process of the approval, supplement, use, adding and check of construction using land.
构建信息系统监管平台,实现了建设用地审批、供地、利用、补充、检查全过程动态化、精细化管理。
Since the image of Faust was first textualized, it has entered a process of constant and repeated description and dynamic construction from the perspective of Neo-historicist theory.
浮士德形象自文本化以来,按照新历史主义的理论规约,就已进入了不断修撰和反复描述的动态建构之中。
Project management is an interrelated organic whole runs through the whole process of project construction, also is a dynamic process continuously adjusted according to the situation.
工程项目管理是贯穿于工程项目建设全过程的、相互联系的有机整体,是根据客观情况不断调整的动态过程。
The cost control of capital construction ought to lay stress on the dynamic control in the whole process.
基本建设的造价控制应注重全过程的动态控制。
Based on the analysis of essential factors which influence the Vc value of RCC mixture, a dynamic-state management method for Vc value in construction process is described.
从影响碾压混凝土拌和物v_c值的主要因素分析开始,研究了在施工中进行碾压混凝土拌和物v _ c值动态管理的方法。
Finally, combining FEM computation with monitoring analysis is the main process of dynamic design which guides construction and assures safety.
将模拟计算结果与监测数据分析相结合,进行反馈分析和动态设计,可以有效地指导施工和保证安全。
According to the HNPC model, the characteristics of construction process are explained. The fuzzy dynamic programming method is introduced into the process control and the realization is presented.
根据HNPC模型的特点,阐明了建筑施工进度计划的特征,把模糊动态规划方法引入到建筑施工进度计划调整中,并给出了具体实现方法。
Based on the research and analysis of the theoretical model and construction process, it developed dynamic kill software, and the example is verified.
在所研究理论模型及工艺流程分析的基础上,开发了动力压井工艺参数设计软件,并进行了实例验证。
Based on the research and analysis of the theoretical model and construction process, it developed dynamic kill software, and the example is verified.
在所研究理论模型及工艺流程分析的基础上,开发了动力压井工艺参数设计软件,并进行了实例验证。
应用推荐