• For example, the cost, effort, and duration of a project are at best educated guesses.

    例如最好也不过有根据地推测项目成本工作持续时间

    youdao

  • In every case, however, the duration of a project is finite. Projects are not ongoing efforts.

    然而任何情况项目期限都有限项目不是持续不断努力

    youdao

  • Therefore, any potential higher, up-front costs are more easily recovered over the duration of a project (see Sidebar).

    因此项目过程中,任何可能更高预先的成本容易回收参见工具条)。

    youdao

  • The assumption that the duration of a project and the whole project's finishing time is random and submitted to some kinds of probability distribution is the theoretical basis of the PERT.

    PERT理论基础假设项目持续时间以及整个项目完成时间随机的,服从某种概率分布

    youdao

  • Smaller companies are viewed as riskier partners that are vulnerable to the loss of key personnel and "may not have the financial muscle to survive for the duration of a project," the authors said.

    公司容易视作危险合作者,因为他们容易流失核心技术人员,还可能"缺乏足够经济力量在项目的开发周期中生存下来,"这位官员还说。

    youdao

  • Now, consider how a project manager sets the duration of tasks in a project plan.

    现在考虑项目经理如何设置项目计划中的任务持续时间

    youdao

  • Those in our industry understand how difficult it is to accurately determine up front the exact scope, cost, or duration of a significant project.

    我们知道我们行业准确地制定一个重大项目功能范围价格或者时间非常困难

    youdao

  • Many project managers have different "rules of thumb" for the maximum duration of any one task, but a common one is that most tasks should not exceed two weeks.

    对于任一任务最大持续时间许多项目经理都有不同经验一般而言,大多数任务超过周。

    youdao

  • Cost itself may be a product of other factors, including the project duration, resources, and environment.

    费用本身可能是产品其它要素包括产品工期资源环境等。

    youdao

  • Large project: Has a budget over $500,000, a team size of thirteen or greater, and a duration of more than a year.

    大型项目预算超过$500,000,团队规模十三人或者更大,项目进行时间超过年。

    youdao

  • With that in mind a project plan was defined with an estimated duration of six days.

    这样一个项目计划天之内制定出来

    youdao

  • Medium project: Has a budget of $100,000-$500,000, a team size of six to twelve, and a duration of six months to a year.

    中等项目预算$100,000-$500,000,团队规模十二人项目进行时间为个月

    youdao

  • Project 2007 USES this calendar to schedule tasks that do not have resources assigned, or for tasks that have a task type of fixed duration.

    Project 2007使用项目日历排定没有资源分配任务的日程,或者类型固定工期任务的日程。

    youdao

  • The objective of fast tracking a project is to: Increase productivity. Reduce project duration. Increase schedule tracking controls.

    项目快速跟进目标提高生产效率减少项目历时提高进度跟踪控制降低项目风险。

    youdao

  • The optimal size of resource is, therefore, defined as the minimum size of resource required to keep the project duration a minimum.

    最佳大小资源所以被界定最小尺寸的资源必须保持项目持续时间减少到最低限度。

    youdao

  • The aggregate production systems at the Three Gorges project, should meet requirements for the concrete placement of stage -I works, with a huge volume and a long construction duration.

    三峡工程第二阶段混凝土浇筑量持续时间,混凝土骨料生产供应必须满足混凝土浇筑要求

    youdao

  • A random variation of size of resources and its effect on project duration, queue length and percentage utilization is highly desirable and deserves attention from the researchers.

    一个随机变化规模资源工程影响时间之长排队长度百分比使用率非常可取的值得重视的,研究员

    youdao

  • Duration of Initial Contract :One year with a 1-month-probation period. Renewable according to project period.

    初步合同时长:合同,连带个月试用期根据项目期限更新合同。

    youdao

  • As compared with common power materials, materials for electric power capital construction are characterized by use for a given project, press of time, short duration in storage, etc.

    电力基建物资一般电力物资相比具有次专用性强、时间要求快、库存时间等特点。

    youdao

  • The methods of identifying critical chain with the goals of minimum project duration and duration-cost tradeoff are put forward. Finally a scheduling example is given to prove the methods' validity.

    然后,工期最小目标与工期-成本权衡目标建立关键识别方法模型,通过算例验证了方法的有效性

    youdao

  • The project has an expected duration of 9 months and a 12-month extension option.

    项目预计持续9个月,另有年备选延期。

    youdao

  • This is a very simple and useful method in practice because it is not necessary to asunune a distribution of the project duration.

    方法需要各工作延续时间分布作出假定,因此具有广泛的实用性

    youdao

  • Schedule development can require the review and revision of duration estimates and resource estimates to create an approved project schedule that can serve as a baseline to (75) progress.

    制订进度过程要求历时估算资源估算进行评审修订从而产生一个经过认可项目进度作为项目进展进行追踪的基准

    youdao

  • Schedule development can require the review and revision of duration estimates and resource estimates to create an approved project schedule that can serve as a baseline to (75) progress.

    制订进度过程要求历时估算资源估算进行评审修订从而产生一个经过认可项目进度作为项目进展进行追踪的基准

    youdao