• Using this theory, the cost controlling method of drilling and completion projects can be regulated so as to reduce the project cost and make work and management more efficiency.

    这种思路提出,可以规范完井项目成本控制方法项目降低成本、提高工作效率管理水平具有一定指导性。

    youdao

  • After drilling, logging and completion operation, a well immediately faces the problem how to achieve high and steady yields.

    一口油井在经过钻井测井井等复杂的作业后,接下来面临难题就是实现高质量的、稳定的采油作业。

    youdao

  • It is important for the drilling and completion to learn about accurate distribution of circulating temperature in the wellbore.

    准确井下循环温度钻井完井工程十分重要

    youdao

  • One of the important parts of formation pressure detection is to determine formation fracture pressure, which is important for drilling, well completion and fracturing.

    地层破裂压力(梯度)确定地层压力检测一个重要组成部分钻井压裂等施工都相当重要。

    youdao

  • Sensitivity to damages and non-recoverability of coal reservoir determines that measures should be taken to protect the system in the process of well drilling, completion and production.

    储层具有伤害敏感性不可恢复性决定了煤层气完井、开采过程坚持采取系统保护煤层措施

    youdao

  • For the successful operations of drilling and completion of the branch wells. it is necessary to maintain borehole stability in construction process.

    为了保证分支钻井作业顺利进行,必须施工过程确保眼的稳定

    youdao

  • Expandable tubular technology can be applied to drilling, well-completion and restoration, and is considered to be one of the core technologies in the current oil drilling industry.

    膨胀技术应用钻井、完井及修井等作业过程,认为当前石油钻井行业核心技术之一

    youdao

  • According to the international cluster drilling standards, the completion of the Well Xinqian 90-2 reaches the fifth level TAML standards.

    按照国际分支分级标准,新浅90—2井分支井完井技术达到TAML五级标准的分支井。

    youdao

  • Slip socket, the fisher of drilling and repairing well, is mostly used as the outer fisher to fish the drop during the drilling and completion.

    卡瓦打捞作为修井打捞工具,主要用于井作业打捞捞工具。

    youdao

  • Horizontal well production forecasting formulas need to consider not only anisotropism and borehole eccentricity, but also the skin factor during drilling and completion process.

    水平井产能预测公式除了考虑储层各向异性偏心距影响因素外,还要考虑钻井井过程中产生的表皮系数的影响。

    youdao

  • Stop for 15-40min (depending on the depth of holes) after completion of drilling, and use the drilling rig to get out the impurities such as sand, etc. settled without controlling the mud.

    钻进完成15-40分钟后,(根据决定时间)钻机打捞一次沉降下去砂子杂质,不要浆。

    youdao

  • Stop for 15-40min (depending on the depth of holes) after completion of drilling, and use the drilling rig to get out the impurities such as sand, etc. settled without controlling the mud.

    钻进完成15-40分钟后,(根据决定时间)钻机打捞一次沉降下去砂子杂质,不要浆。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定