• What is there on the drill floor?

    钻台只钻头。

    youdao

  • The drill floor hasn't been cleaned.

    钻台没有清洗

    youdao

  • From that position can be seen the drill floor.

    那个位置可以看见钻台

    youdao

  • This morning he got his clothes on the drill floor.

    地下午钻台衣服弄湿了。

    youdao

  • Check power tongs and spinning rope are on drill floor.

    检查动力是否钻台上。

    youdao

  • This roughneck washed and cleaned drill floor this morning.

    今天早上这个钻工冲洗了钻台

    youdao

  • This roughneck washed and cleaned drill floor this 2 morning.

    今天早上这个钻工冲洗了钻台

    youdao

  • He is not working on drill floor; He is working in engine house.

    现在不在钻台工作,他机房工作。

    youdao

  • Please put these two lift subs onto drill floor, we shall use it!

    两个提升放到钻台上去,我们用!

    youdao

  • Pleottom put these two lift subs onto drill floor, we shall use it!

    两个擢升短节放到钻台上去,我们

    youdao

  • 8 meters, while the foundation tower above the ground a certain distance and have a certain breadth, workover drill floor cannot span the foundation to set down.

    8抽油机基础高出地面距离并且具有一定宽度,现有的修井钻台不能跃基础摆放,必须拆除基础才能进行大修作业。

    youdao

  • Its environmentally protected control room with touch screen displays and joystick controllers integrate with a fully automated drill floor to keep your crew out of harm's way.

    环保型控制室内配有触摸屏显示器操纵杆控制器集成全自动钻台工作人员消除一切安全隐患。

    youdao

  • To investigate the hurricane activity of the Pliocene, the researchers relied on proxy ocean temperatures based on variations in several chemical tracers in drill cores of the ocean floor.

    为了研究上新世飓风活动情况,研究人员依靠代理海洋温度,这个温度是基于洋底岩芯几种化学变化引起的。

    youdao

  • Personnel may drill an array or series of holes (in a floor space for example). Operators follow along with the fiber-optic device(s) making quick assessments.

    搜救人员受灾部分(例如楼板上;搜索人员随后使用光纤成像设备对搜救现场的情况做出快速评价

    youdao

  • When picking up or setting down drill collar stands larger than 6 1/4" on the floor board, always snub with the air tugger."

    在钻杆盒上提起放置直径大于6 1/4〞立柱时,一定要气动绞车拉住以保安全。

    youdao

  • Top tension risers (TTRs) are used as the conduits between dynamic floating production units and subsea systems on the sea floor, for drill, complete or production facilities.

    顶部管(TTR用于连接运动浮式生产设施海床的海底系统管道,顶部张紧立管可用于钻井生产。

    youdao

  • The microbes were discovered in 2012 when a gigantic drill penetrated a record-breaking 2.5 kilometers beneath the sea floor off the coast of Japan.

    2012年,巨型钻头打破了纪录,深入日本沿岸海域海底2.5千米发现了微生物

    youdao

  • The microbes were discovered in 2012 when a gigantic drill penetrated a record-breaking 2.5 kilometers beneath the sea floor off the coast of Japan.

    2012年,巨型钻头打破了纪录,深入日本沿岸海域海底2.5千米发现了微生物

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定