• With the dredging projects in the Lower Yellow River, the environmental background values of the dredging silt have been determined by means of on site sampling and measurement.

    结合黄河下游疏浚工程通过现场取样化验确定疏浚底泥环境背景

    youdao

  • The site of Tongguan Kiln covers an area of 0.68 square kilometers, with 46 sites of Gulong Kiln and 19 dredging holes.

    官窑遗址保存面积0.68平方公里保护区内古龙遗址46处、挖泥19处。

    youdao

  • The site of Tongguan Kiln covers an area of 0.68 square kilometers, with 46 sites of Gulong Kiln and 19 dredging holes.

    官窑遗址保存面积0.68平方公里保护区内古龙遗址46处、挖泥19处。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定