• Basic work of economic management should be strengthened so as to guarantee drawing up and implement of project budget and pledge to fulfil the goal and tasks of geological projects.

    加强经济管理基础工作保证项目预算编制执行从而保障地质项目工作任务目标的完成。

    youdao

  • Organize project files and keep tracks on changes order, follow up with consultants; make sure the drawing is adhesive to the design.

    整理项目档案文件,追踪所有设计变更相关文件,并确认正确性

    youdao

  • Construction project quality problem analysis is the precondition for drawing up treatment scheme and the basis for making clear responsibility of quality accident.

    施工项目质量问题分析正确拟定质量事故处理方案前提,是明确质量事故责任依据

    youdao

  • The size of the project is determined by drawing up a detailed specification of the amount of text to be translated for all the files.

    衡量项目规模我们通过一个所有文件中需要翻译文本详细说明

    youdao

  • The size of the project is determined by drawing up a detailed specification of the amount of text to be translated for all the files.

    衡量项目规模我们通过一个所有文件中需要翻译文本详细说明

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定