For ensuring the safety of construction and traffic, a 4700 m-drainage tunnel was built to release the karst water in the Maluqing tunnel.
为此,在隧道进口设置长约4700 m的泄水洞,以泄出溶洞内高压水,保证隧道施工及运营安全。
The measured data of the groundwater level, rainfall and the drainage tunnel discharge about the landslide are studied.
通过实际工程,研究降雨量、地下水位、排水隧洞流量的监测数据资料。
The measured data of the groundwater level, rainfall and the drainage tunnel discharge about the landslide are studied.
通过实际工程,研究降雨量、地下水位、排水隧洞流量的监测数据资料。
应用推荐