• The indoor experiment on the filling materials used for downward slicing drift mining with cemented backfill in Gaolong Gold Mine was performed.

    对高龙金矿下向分层胶结充填采矿所用充填材料进行了室内试验研究。

    youdao

  • A steeply inclined downward running ribbed belt conveyor is developed according to the funnel layout at Xieyi coal mine in Huainan to meet the demand in coal mining with inclined coal bed.

    适应倾斜煤层开采需要结合淮南煤矿巷道布置研制了台大倾角下运花纹式输送机。

    youdao

  • A steeply inclined downward running ribbed belt conveyor is developed according to the funnel layout at Xieyi coal mine in Huainan to meet the demand in coal mining with inclined coal bed.

    适应倾斜煤层开采需要结合淮南煤矿巷道布置研制了台大倾角下运花纹式输送机。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定