The Penstock laid on downstream face of dam is not only a new type of arrangement, but also a new kind of structure.
混凝土坝下游面钢衬钢筋混凝土管道既是一种新型的布置方式,又是一种新型的结构形式。
There are many treatment method for seepage of concrete dam body. Blocking at upstream face and drainage at downstream face is one generally adopted.
混凝土坝体渗水处理目前方法很多,一般采用上堵下排的方法。
There are many treatment method for seepage of concrete dam body. Blocking at upstream face and drainage at downstream face is one generally adopted.
混凝土坝体渗水处理目前方法很多,一般采用上堵下排的方法。
应用推荐