Introduces OCS construction transitional plan such as railway line-moving, line-crossing and side-exchanging, bridge and track laying, station closing up etc. on Zhuzhou-Liupanshui double track lines.
介绍了株六复线改造因线路拨移、线路交叉换侧、桥梁铺架、车站封闭等引起接触网施工方案的过渡。
Such algorithm is applicable to regular, irregular, single track and double track train operation diagrams, and can solve conflict problems of operation line in a short period.
该算法适用于周期、非周期、单线和双线列车运行图,能在较短的时间内解决运行线的冲突问题。
A great amount of post tensioned pre-stressing concrete single box beam for double track (as called the box beam hereinafter) has been used on the line.
该线大量采用后张法预应力混凝土双线单箱简支箱梁。
A description is given to method and technology adopted against track deviation during construction of elastic monolithic track bed in long double line tunnel.
针对长大铁路双线隧道轨道结构施工中发生的弹性整体道床轨道偏移问题,阐述了纠偏的方法和施工工艺,为以后同类工程提供借鉴。
The additional track of rail, when completed, will double the capacity of the line to 200,000 tonnes.
新修铁路一旦竣工,原有运输能力将翻一番,达20万吨。
The additional track of rail, when completed, will double the capacity of the line to 200,000 tonnes.
新修铁路一旦竣工,原有运输能力将翻一番,达20万吨。
应用推荐