• In excavation of double span tunnel, there exists a big water-eroded groove. The method of elastic foundation beam is used to cope with the situation.

    隧道岩溶地区施工中遇到大型采用弹性地基法成功跨越。

    youdao

  • In excavation of double span tunnel, there exists a big water-eroded groove. The method of elastic foundation beam is used to cope with the situation.

    隧道岩溶地区施工中遇到大型采用弹性地基法成功跨越。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定