The processing features of parallel spinning and the design of conjugated spinning beam with double shield melt canal are introduced in detail.
详细说明平行纺丝的工艺特点和双护套熔体通道的复合箱体设计。
Now you can double click Hotspot Shield shortcut, and wait for the connection.
现在,你可以双击hotspotShield快捷方式,等待连接建立。
Now you can double click Hotspot Shield shortcut and wait for the connection.
现在,你可以双击HotspotShield快捷方式,等待连接建立。
The first grate has double spherical nets with the same center and outside the second one there is a shield cylinder to make electron congregate.
它采用四极枪结构,两个栅极,第一栅极采用双层同心球面网,第二栅极外还添加了屏蔽筒。
In China, the copper shield structuring technology characterized by good performance and simple manufacture can now be successfully applied to the double water cooled 300 MW generators.
性能优良、制造简便的铜屏蔽结构技术已被成功地移植到我国首创的双水内冷300MW发电机上。
At present, the shielded category cables use single or double copper braid as shield, which features low productivity and high costs.
目前使用的屏蔽数据通信电缆通常为单层或双层铜丝编织结构,生产效率低,成本高。
It is comprised of multiple stage centrifugal pump, double stage gas separator, protector, submersible motor, guard shield and setting gas separator.
它主要由多级离心泵、双级分离器、保护器、潜油电机、护罩、沉降分离器组成。
Top flap features a tab closure that secures with a "LRL"-embossed double spring-action shield lock at the front.
顶部瓣功能封一个标签,“LRL”浮雕双弹簧行动在前面的盾锁保护。
The truncated double conical wake shield facility has been studied in theory in the paper.
从理论上对截头双圆锥分子屏进行研究。
This paper discusses the raw materials and process technology of the double cone ablative shield made from resin matrix composites.
本文对树脂基复合材料双锥防热套的原材料选择和成型工艺进行了研究。
This paper takes the TBM Application in Shanggongshan tunnel as an example, expatiates the typical problems and difficulties encountered during the course of double-shield TBM construction.
本文以昆明市掌鸠河引供水工程上公山隧洞TBM施工为例,阐述了双护盾隧洞掘进机(TBM)在不良地质条件下施工所遇到的典型问题。
The construction plan of double-joined arch is validated using numerical simulation when dilapidating segments to construct single connecting tunnel between two shield-driven tunnels in this paper.
应用数值模拟方法研究了在盾构法修建隧道的基础上拆除管片修建渡线隧道中双联拱段方案的可行性,研究表明双联拱方案是可行的;
The construction plan of double-joined arch is validated using numerical simulation when dilapidating segments to construct single connecting tunnel between two shield-driven tunnels in this paper.
应用数值模拟方法研究了在盾构法修建隧道的基础上拆除管片修建渡线隧道中双联拱段方案的可行性,研究表明双联拱方案是可行的;
应用推荐