• An optimum design method for the artificial bend channel in diversion headwork of bend type by the theory of minimum rate of energy dissipation.

    最小能耗原理应用到低水头弯道引水枢纽设计

    youdao

  • The extension project of Taocha Canal Headwork will be the water sources project of the Middel Line of Diversion Project from South to North China.

    陶岔枢纽后期续建工程南水北调中线工程水源工程

    youdao

  • The extension project of Taocha Canal Headwork will be the water sources project of the Middel Line of Diversion Project from South to North China.

    陶岔枢纽后期续建工程南水北调中线工程水源工程

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定