For example, the central combined heat and power plant was probably the best move from an energy performance standpoint and yields direct cost savings over the life of the project.
比如,采用集中供热可能是从能源效益立场和整个项目生命周期角度来看所得出的最佳做法。
The quality of the cost target management has direct relations to the success or failure of the engineering project management.
成本目标管理的质量直接关系到工程项目管理的成败。
Municipal Engineering team-building is a complex process; the team will have a direct impact on the successful progress of the project, cost, and three key quality factors.
市政工程团队建设是一项复杂的工作,团队建设的成功与否直接影响工程进度、成本、质量三个关键因素。
The project is of great significance for aircraft manufactures and airlines to evaluate direct operating cost (DOC) and control aircraft design.
该科研项目对飞机制造商,航空公司在飞机设计宣传,控制成本方面有着极其重要的意义。
The top emphasis of the project cost control should be placed on internal management, especially on the effective control of the direct cost and construction period.
工程成本控制主要是放在内部管理上,特别是直接工程费和工期的有效控制,其次外部的市场因素和施工阶段的变更索赔也是着重考虑的一个方面。
The direct meaning of project cost is the construction price.
工程造价的直意就是工程的建造价格。
Abstract: the cost management of construction project is the direct manifestation of construction enterprise's profit. The effective measure of cost management helps to realize cost goal.
[摘要]施工项目成本管理是施工企业利润的直接体现,有效的成本管理措施有利于成本目标的实现。
The reliability of geological parameters for design of engineering projects is direct important for the economic cost and safety of an engineering project construction.
工程设计所需的地质参数的可靠性如何,直接关系到工程建设的经济性与安全性。
The level of project cost, a direct reflection of an enterprise's management level, but also directly affects the quality of the projects and the economic efficiency of enterprises.
工程项目成本的高低,直接反映着一个企业的管理水平,也直接影响到工程的质量和企业的经济效益。
Under the support and instruction of mbb work out the six sigma annual oe plan including6sigma project lean workshop project direct cost saving and indirect cost saving.
在黑带大师的支持下,制定年度六西格码和精益生产成本节约计划。
Making use of the relations among the direct cost, the indirect cost and the total cost, we get the best time limit for the project with results of the optimal T-C decision-making.
利用直接费用、间接费用与总费用的关系,预测出总费用最低时对应的工期,从而给出了工期一费用的最优决策。
Making use of the relations among the direct cost, the indirect cost and the total cost, we get the best time limit for the project with results of the optimal T-C decision-making.
利用直接费用、间接费用与总费用的关系,预测出总费用最低时对应的工期,从而给出了工期一费用的最优决策。
应用推荐