If the traditional digging method is still followed , not only to destroy the road surface, but also to bring the traffic jam and much inconvenience to the citizen.
如果还继续沿用传统的“挖槽埋管法”不但破坏原路面质量,同时将对地上交通造成很大的影响,给市民的工作和生活带来诸多不便。
Deploying an Axis Web service is cumbersome and takes a bit of digging around to sort everything out, with Web Services Deployment Descriptor (.wsdd) files being the best supported method.
部署AxisWeb服务非常繁琐,并需要深入挖掘才能对每种东西进行分类,同时WebServicesDeploymentDescriptor (.wsdd)文件是最受支持的方法。
The paper proposed compute formula of digging pile panelling vertical cross section, introduced construction method and analysed economic benefit.
提出了挖孔桩护壁竖向截面积的计算公式,介绍了施工方法,分析了经济效益。
This paper presents a suporting method in digging between adjacent buildings, its operation and structural calculation, with a practical instance given.
简述在相邻建筑物间开挖的一种支护方法,及其施工方法、结构计算等,最后给出工程实例。
The paper researchs the principle of protective seam mining, hydraulic slotting method and executing-digging technology to avoid risk of coal-gas outburst, and its practices in coal mine.
通过分析近距离保护层开采、水力掏槽法及边抽边掘技术防治煤与瓦斯突出原理及实践应用,从而有利于煤与瓦斯突出矿井选择合理有效的防突技术。
This article discuss the method to avoid the eutrophication problem of water body from the digging up the lake sediments which may lead to destroying the blance of nitrogen and phosphorus in water.
从底泥挖掘可能导致水体营养元素平衡破坏的成因入手,探讨避免水体富营养化加剧的对策。
The whole section explosion method which is the one for underground construction digging, suitable for stable and strong dam, form a section for one time by drilling explosion.
全断面钻爆法适用于围岩坚固稳定,采用钻孔爆破方法将洞室开挖断面一次性开挖成型的地下建筑工程洞室开挖掘进方法。
The strengthening method of digging groove and increasing hidden beam is proposed by combining an actual project, which avoids all of demolition and restitution.
结合实际工程,提出了开槽设暗梁的楼板加固方法,避免了全部拆除重建。
The preparation method comprises the following steps of: digging the plurality of holes on the heat-resisting insulating thin plate supporter and covering the conducting net on each hole;
制备方法为:在耐高温绝缘薄板支撑体上挖多个孔洞并覆盖一个导电网;
A hydraulic loop of digging machine was selected as an example, the feasibility of the method was validated.
以挖掘机液压回路为例,验证了所提方法的可行性。
When sand sinking pools are full and lose efficacy, the method of "digging out sands to wait for deposition" can increase the life of irrigation region.
当沉沙池淤满,失去自流沉沙作用时,采用“以挖待沉”可以延长灌区运行年限,但没有扬水沉沙方案优越。
The geological condition is complicated and varies often. Using the method of pre-support through hammering wedge, the cave mouth digging work of No. 640 main transportation channel was successful.
简述了板石矿业公司上青矿640主运输平巷在硐口段施工过程中,克服地质条件复杂、多变的现状,采用撞楔超前支架法施工,硐口掘凿获得成功。
The geological condition is complicated and varies often. Using the method of pre-support through hammering wedge, the cave mouth digging work of No. 640 main transportation channel was successful.
简述了板石矿业公司上青矿640主运输平巷在硐口段施工过程中,克服地质条件复杂、多变的现状,采用撞楔超前支架法施工,硐口掘凿获得成功。
应用推荐