• The arch rib have been fabricated longitudinal by 7 segments, and used the non-support cable crane installation and the steel cable diagonal-tension method.

    纵向7预制,采用无支架缆索吊机安装钢丝绳斜拉扣挂法施工。

    youdao

  • The arch rib have been fabricated longitudinal by 7 segments, and used the non-support cable crane installation and the steel cable diagonal-tension method.

    纵向7预制,采用无支架缆索吊机安装钢丝绳斜拉扣挂法施工。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定