The selection and test determination of smooth blasting parameters, layout of snubbers, charging structure, initiation device, tubing effect, blasting effect and its properties are involved.
其中涉及到光面爆破参数的选择与试验确定,掏槽眼的布置方式、装药结构、起爆手段、管道效应、爆破效果及特点。
The design of test installation device, layout of test line, selection and installation of test sensor, development of submersible electric pump speed equipment is included.
流体输送测试系统的设计、试验管路的布局、综合测试系统测试传感器的选用、安装和潜水电泵转速设备的开发。
The parameter selection of frequency regulation resonance test device and its application is presented.
介绍了某公司调频谐振耐压试验装置参数的选型和应用情况。
This paper introduced various device related in test of vertical compression static bearing resistance of single pile, and discussed the requirement of selection and installation of various device.
介绍了单桩竖向抗压静载试验中涉及的各项仪器设备,讨论了各仪器设备的选择与安装要求。
The coordination requirements and test methods of short circuit protective device (SCPD) in standard GB14048.4 are introduced. The selection methods of circuit breaker or fuse as SCPD are described.
介绍GB 14 0 4 8 4中与短路保护装置(SCPD)协调配合的要求和试验方法,叙述SCPD为断路器或熔断器时选配方法。
The coordination requirements and test methods of short circuit protective device (SCPD) in standard GB14048.4 are introduced. The selection methods of circuit breaker or fuse as SCPD are described.
介绍GB 14 0 4 8 4中与短路保护装置(SCPD)协调配合的要求和试验方法,叙述SCPD为断路器或熔断器时选配方法。
应用推荐