Can anyone design a better timetable?
有人能定出更好的时间表吗?
There must be a timetable for prospecting and design, and there must be people in charge of monitoring each undertaking.
要列出进度表,什么时间勘探清楚,什么时间拿出设计,由专人负责包干。
There must be a timetable for prospecting and design, and there must be people in charge of monitoring each undertaking.
要列出进度表,什么时间勘探清楚,什么时间拿出设计,由专人负责包干。
应用推荐