The sponsor will notify beforehand the design entity of any change as for foregoing time of submission.
方案征集时间如有变动,组织方将提前告知设计单位。
Besides acting independently as the general contractor, the design entity or the construction company may also establish a joint venture for general contracting.
除了单独作为工程总承包商外,设计单位与施工企业也可以组成联合体工程总承包商。
Besides acting independently as the general contractor, the design entity or the construction company may also establish a joint venture for general contracting.
除了单独作为工程总承包商外,设计单位与施工企业也可以组成联合体工程总承包商。
应用推荐