If these are not progressed satisfactorily then we would not issue a design acceptance confirmation, "the agency concluded following a study of the latest French EPR and US AP1000 reactor designs."
在研究了最新的法国EPR以及美国的AP1000反应堆设计之后,该机构得出了上述结论。
The technical conditions are served as the basis for the design, acceptance and application of SEI system for Shi-Tai line.
本技术条件作为石太线SEI系统设计、验收及运用的依据。
The technical conditions are served as the basis for the design, acceptance and application of SEI system for Shi-Tai line.
本技术条件作为石太线SEI系统设计、验收及运用的依据。
应用推荐