• The result indicates that the discharge per unit width, the sediment concentration, the grain size of sand influences the depth of scour hole.

    试验结果表明:浑水水流流量大小含沙量多少以及含沙粒径的变化都对冲刷坑深度有一定的影响

    youdao

  • The model can calculate scour depth of riverbed and armoring steady graduation simultaneously.

    模型同时河床冲刷深度稳定级配进行计算

    youdao

  • The scour of subgrade along river side is a main type of the highway washout of flood, the maximum scour depth would effect the subgrade safety directly.

    沿河公路路基冲刷公路水毁中的一个主要类型最大冲刷深度直接影响沿河路基的安全

    youdao

  • The variations of the local scour equilibrium depth with the parameters of the jet, such as jet exit height, width, velocity and sediments characteristics, were observed in the experiments.

    实验观测射流局部达到冲刷平衡时,最大冲刷深度随射流喷口高度、喷口宽度、喷口流速、横流流速泥沙特性变化规律。

    youdao

  • The scour limit depth around spur dikes is very important for calculating the base depth of objects and it is a key factor in designing and working.

    丁坝极限值确定建筑物基础埋设深度一个主要因素丁坝设计施工中的关键问题在于确定坝头最大冲深。

    youdao

  • The depth of river channel scour is calculated by the scour rate and scour time.

    河道冲刷深度主要决定于冲刷冲刷历时。

    youdao

  • The calculation results of scour depth and stabilization of riprap are consistent with the actual situation.

    经过验算,抛石稳定性计算与实际工程的结果较为一致

    youdao

  • The functional formulae are used to predict the scour depth in the Qiantang River estuary. The location of maximum scour depth is also discussed.

    根据最大冲刷计算泛函公式预测钱塘江河口研究河段极端洪水作用的最大冲刷深度,并讨论了断面最大冲刷深度可能出现的位置

    youdao

  • The situation of maximum scour in river bend and the evaluation of its maximum depth, especially for small and medium brook or river in mountain, arc discussed in this paper.

    本文讨论了河湾最大冲刷位置最大冲刷水深特别是山区中小河流)的计算

    youdao

  • Finally, we obtained distribution of the maximum depth of local scour under each experimental group by analysing and comparing the maximum depth data of local scour maximum.

    最后通过分析对比局部最大冲刷深度资料得出试验组次局部最大冲刷深度分布规律

    youdao

  • High velocity of flow channel in the bottom mat, mat extended length according to the cage height and maximum scour depth to determine.

    流速河道应在下部设置网,网垫伸出长度根据网箱高度最大冲刷深度确定。

    youdao

  • Local scour on bridge pier caused by the sand movement is based on turbulence, understanding the turbulence characteristics in-depth can better raise awareness of local scour on bridge piers.

    引起桥墩局部冲刷泥沙运动是以水流脉动为基础,只有深入地了解水流的脉动特性才能更好地提高桥墩局部冲刷的认识

    youdao

  • Local scour on bridge pier caused by the sand movement is based on turbulence, understanding the turbulence characteristics in-depth can better raise awareness of local scour on bridge piers.

    引起桥墩局部冲刷泥沙运动是以水流脉动为基础,只有深入地了解水流的脉动特性才能更好地提高桥墩局部冲刷的认识

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定