Proper planning is critical on this size scale if you do not plan properly this can delay schedule and cost the client money.
对大规模项目合理规划才是关键所在,如果没有合理的规划,就会延误工期、造价更高。
The bottom line is clear: We've created a foreseeable and avoidable bottleneck on the resource and a delay in the schedule.
底线是很清晰的:我们在资源上创建了一个可以预见的、可以避免的瓶颈和一个时间计划上的延迟。
You 'd better make a schedule to the line in case that your trip delay too long.
你最好计划下你的行程路线,以免旅途耽搁太长。
In the Schedule Element Details to the right, on the General TAB, select the Add a delay between starting each user checkbox and enter a delay of 500 milliseconds, as shown in Figure 13.
在ScheduleElementDetails的右边,General工具条上,选择addadelaybetweenstartingeachuser复选框并键入500毫秒的延迟时间,如图13所示。
A tight schedule means we can't delay any longer.
一张紧凑的时间表表明我们不能再耽搁。
If we don't keep to the schedule, the delay could lose us our external funding.
如果我不遵守日程,那么延误将使我们损失外部的资金。
During the implementation, the BUYER may discontinue or stop any pre-approved delegated personnel who are found inefficient and causing delay in the Project schedule.
在执行期间,买方可以停止或终止任何先前同意的但后来发现效率低并影响项目进度的代表人员。
On the General TAB in the Schedule Element Details section, select the Add a delay between starting each user box, as shown in Figure 15.
在ScheduleElementDetails部分的General标签上,选择addadelaybetweenstartingeachuser框体,如图15所示。
You can only control the production schedule but not others. What we should take into consideration is warehouse blocking due to delay of delivery of other supplier.
因为你可以掌握自己工厂的生产进度,但是别的厂家你不能够控制。如果因为其他厂家延迟交货而导致未能准时出货从而导致仓库堵塞也是我们所需要考虑到的问题。
He says any delay is hazardous, so you should let him schedule as soon as you possibly can.
他说无论因何事耽延,都是在冒险,所以想让你同他尽快把时间定下来。
Before one of my treatments, a schedule delay caused by a mechanical problem left me and another patient sitting together in the waiting room.
有一天在医院时,因为机器故障而延后治疗时间,我和另一位病患一起坐在候诊室里等待。
The parties have reached an agreement on the flag date defined in article 8.6 (Project Schedule and consequences of delay). according to the requirements of the revised preliminary design.
各方己根据修改后的初步设计的要求就第8.6条(项目进度表和延误后果)规定的标志日期达成一致。
Subcontractor is not the cause of the delay to the Subcontract Time Schedule.
分包商是不是推迟的原因的分包合同的时间表。
Due to the large number of runners, please take the bus according to the above boarding schedule to avoid delay.
因参加人数众多,各参加者请按照上述时间及于指定地点登车。
Along with the increase of the requirements on software system, more and more questions which will result in software project failure appear, such as budget excess and schedule delay.
随着软件系统需求的不断增长,导致项目失败或者延期、超出预算或品质低劣的问题也越来越多。
Out of these three processes, beacon scanning has observed to impose a significant delay, which leads toa big challenge on howto schedule this event so as to favor fast-roaming.
在这三种过程中,指示扫描造成的延时最为严重,这种时延为时间的定时制造了难度以至于出现快速漫游。
During the long period, It is believed that the mainly reason is the engineering change which results in schedule delay and cost overruns of the construction project.
在这个较长的建设周期内,工程变更被认为是导致项目工期延迟和费用超支的主要原因,在工程建设项目管理过程中倍受重视。
Many temporary tasks which cannot be finished will trouble you, which may delay the schedule of teamwork. Therefore, it will be the thorn for many people, and is difficult for solving problem.
常有忙不完的临时任务,一拖再拖导致了团队进度延后,成为众人的眼中钉肉中刺,不善化解。
In cases of those projects that neither start on schedule nor apply for delay or exceed the period of permitted delay, the validity of the working licenses automatically expires.
既不开工又不申请延期或者超过延期时限的,施工许可证自行废止。
Minor: Can be used after rework, or missing parts but do not delay XXXXX delivery schedule.
一般:重工后可以使用,或虽然缺件,但没有影响XXXXX生产线停线。
Abstract: During the execution of the project, schedule delay is always the focus of dispute between the two parties of the contract.
[摘要]项目执行期间的工期延误问题往往成为双方争议的焦点。
If there is a Delay, rather than grant an extension of the Contract Schedule, the Owner may direct the Development Manager to expedite the Work.
如有延误,业主可以指示开发管理人加快工程进度,而非将合同进度延展。
There is no change of attribute value in a few projects' estimation, but its effort grows with schedule delay. This fails to be conformant with the intended use of the organization's estimation model.
少数项目属性值的估算没有变化,但工作量估算随工期的延长而增加,不符合估算模型的精神。
There is no change of attribute value in a few projects' estimation, but its effort grows with schedule delay. This fails to be conformant with the intended use of the organization's estimation model.
少数项目属性值的估算没有变化,但工作量估算随工期的延长而增加,不符合估算模型的精神。
应用推荐