Such renegotiation could jeopardize federal funding and delay construction, but the needless haste created by Washington's arbitrary deadlines have resulted in mistakes that could be extremely costly.
这样的谈判或许会让联邦基金更加捉襟见肘,也可能会延迟建设,但是华盛顿恣意定下的死线造成了没有必要的犹豫,而这种犹豫所导致的错误或许更加昂贵。
In project construction contracts, there aren't clear agreements on the composition and calculation of Liquidated Damages for Delay at present, which have brought many difficulties.
目前工程施工合同对误期损害赔偿的构成和计算的约定不够明确,给工程实施带来了很多困难。
During the long period, It is believed that the mainly reason is the engineering change which results in schedule delay and cost overruns of the construction project.
在这个较长的建设周期内,工程变更被认为是导致项目工期延迟和费用超支的主要原因,在工程建设项目管理过程中倍受重视。
Project delay is a common problem in the world construction industry today. For the construction of engineering project in our country, this problem is especially outstanding.
工期延误问题是当今世界建筑业中普遍存在的问题,对于国内工程项目建设而言,这个问题尤为突出。
We have allowed that the necessary plant, equipment and Labour is available in close proximity to commence work, with minimal delay or construction ramping.
我们已允许必要的厂房,设备和劳动力,可在近距离展开工作,并且最大限度地延误或施工慢。
Abstract: The dispute of liquidated damage for delay (LAD) is not uncommon in construction and engineering.
[摘要]有关逾期违约金争议是较为常见的工程施工合同争议类型。
Consequently, the thick filling does not consolidate in the following process of construction, which results in the delay of completing.
在后续施工过程中,随着路基高度的增加路基不再被压密,导致固结过程所需的时间延长,工期滞后。
Several design methods and their experimental results are introduced. Design of acoustic cascade is firstly put up, which is effectively used in 1024 bits long delay time SAWTDL construction.
介绍了1024位声表面波抽头延迟线(SAWTDL)的几种设计结构及试验结果。其中声学级联结构为首次提出,是解决高位、长时延SAWTDL设计的行之有效的结构。
The third chapter presents a structural study of Hamlet and The Spanish Tragedy, and finds that Shakespeare's plot construction and treatment of space and mind intensify the effect of delay in Hamlet.
第三章将《哈姆雷特》与《西班牙悲剧》做了比较,发现尽管两剧相似处甚多,但是前者中情节设置、对空间和心理的独特处理方式使《哈姆雷特》的延宕更能激起受众的强烈心理感受。
Design of acoustic cascade is firstly put up, which is effectively used in 1024 bits long delay time SAWTDL construction.
其中声学级联结构为首次提出,是解决高位、长时延sawtdl设计的行之有效的结构。
Design of acoustic cascade is firstly put up, which is effectively used in 1024 bits long delay time SAWTDL construction.
其中声学级联结构为首次提出,是解决高位、长时延sawtdl设计的行之有效的结构。