Introduction the procedure of the construction of deep water pile foundation of the highway Bridges, Analyze out each from of advantage, weakness and usage term, provide the help for engineering.
简要介绍深水桥梁基础钢围堰的两种施工程序,分析出各自的优缺点及使用条件,为工程的实施提供参考。
For the construction of highway bridge, the intallation of foundation in deep water was considesed to be one of the important and difficult job.
深水基础施工是公路桥梁建设的重点和难点之一。
It directly affects the quality of the construction of the deep water drainage effect, and the foundation of the consolidation of time.
它的施工质量直接影响到深层排水效果及地基的固结时间。
The diaphragm wall is a stopping soil and water structure which hydraulic excavation retaining uses more. Its construction is the key to the success of deep foundation pit.
地下连续墙是水利工程基坑支护应用较多的挡土、挡水结构,其施工是深基坑支护成功与否的关键。
It is anticipated that it is of some help to the design and construction of bridge deep water foundation in our country.
希冀对我国桥梁深水基础的设计和施工有一定的借鉴作用。
The procedure of construction with earth-bag cofferdam is introduced for the open-cut foundation in deep water and sandy soil with a narrow space at Pier No.
介绍了目前在日本应用的一种新的结构形式,即采用加筋材料包裹土体———“土袋”加固软土地基的方法,并从试验和理论两个方面介绍了土袋的加固机理。
The procedure of construction with earth-bag cofferdam is introduced for the open-cut foundation in deep water and sandy soil with a narrow space at Pier No.
介绍了目前在日本应用的一种新的结构形式,即采用加筋材料包裹土体———“土袋”加固软土地基的方法,并从试验和理论两个方面介绍了土袋的加固机理。
应用推荐