• In the days following, samples of solid gypsum were repeatedly brought on deck as drilling operations penetrated the seafloor.

    接下来的几天里随着钻探作业深入海底固体石膏样品不断地被带上甲板

    youdao

  • The cellar deck is the lower deck on a semisubmersible drilling platform with two decks.

    具有层甲板的潜式钻井平台上,它甲板

    youdao

  • Since the legs touch the seafloor and support the drilling deck, oil industry people call a jackup a bottom-supported rig.

    由于海床表面、支撑钻井平台,所以这种平台就被石油业界称作自升式底部支撑平台。

    youdao

  • Since the legs touch the seafloor and support the drilling deck, oil industry people call a jackup a bottom-supported rig.

    由于海床表面、支撑钻井平台,所以这种平台就被石油业界称作自升式底部支撑平台。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定