Finally, the initial construction state and dead load state of Jiangyin Yangtze River Highway Bridge are calculated as a numerical example. It is shown that the initial construction sta...
运用该方法对江阴长江大桥进行了计算,计算结果表明:该方法能比较准确地计算出悬索桥施工理想初态和成桥状态。
The catenary theory and geometrical nonlinear finite element method were adopted in determining the dead-load state of self-anchored suspension bridge with spatial cables.
结合悬链线理论和几何非线性有限元方法,对空间缆索自锚式悬索桥成桥状态的确定方法进行了研究。
The influences of dead weight of structure, temporary load, structural stiffness, creep and shrinkage in concrete effect on finished dead state of hybrid girder cable-stayed bridge were analysed.
以广州东沙大桥独塔边跨带辅助墩的混合梁双索面斜拉桥为例,采用对比分析的方法,定量分析结构自重、临时荷载、结构刚度、混凝土收缩徐变这些因素对混合梁斜拉桥成桥状态的影响。
Further, the piston is operated at the top dead center position and in the resonance state under all load conditions, thereby further increasing operation frequency.
此外,在所有负载条件下将活塞操作在上死点和共振状态,从而进一步增加操作频率。
Further, the piston is operated at the top dead center position and in the resonance state under all load conditions, thereby further increasing operation frequency.
此外,在所有负载条件下将活塞操作在上死点和共振状态,从而进一步增加操作频率。
应用推荐