• Finally, the initial construction state and dead load state of Jiangyin Yangtze River Highway Bridge are calculated as a numerical example. It is shown that the initial construction sta...

    运用该方法江阴长江大桥进行了计算,计算结果表明方法能比较准确地计算出悬索桥施工理想成桥状态

    youdao

  • The catenary theory and geometrical nonlinear finite element method were adopted in determining the dead-load state of self-anchored suspension bridge with spatial cables.

    结合悬链线理论几何非线性有限元方法,对空间缆索自锚悬索桥成桥状态确定方法进行了研究。

    youdao

  • The influences of dead weight of structure, temporary load, structural stiffness, creep and shrinkage in concrete effect on finished dead state of hybrid girder cable-stayed bridge were analysed.

    广州东沙大桥独塔边跨带辅助墩混合双索面斜拉桥为例,采用对比分析的方法,定量分析结构自重临时荷载、结构刚度混凝土收缩变这些因素混合梁斜拉桥成桥状态影响

    youdao

  • Further, the piston is operated at the top dead center position and in the resonance state under all load conditions, thereby further increasing operation frequency.

    此外所有负载条件下活塞操作死点共振状态从而进一步增加操作频率

    youdao

  • Further, the piston is operated at the top dead center position and in the resonance state under all load conditions, thereby further increasing operation frequency.

    此外所有负载条件下活塞操作死点共振状态从而进一步增加操作频率

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定