• During the construction of Daxia Hydropower Station, the management pattern of construction management combined with production management was adopted.

    大峡水电站建设实行建设管理和生产运行合一的管理模式,在建设的全过程进行“三控制、一协调”。

    youdao

  • During the construction of diversion channel in Daxia Hydropower Station in Yellow River, a retaining rock bar was reserved at entrance of diversion channel.

    黄河大峡水电站导流明渠施工期间,在进口处采用预留岩坎挡水。

    youdao

  • This algorithm is applied to fault diagnosis for unit no. 2 of the Daxia hydropower station. Results show that this method can help accurately identifying the faults and their categories.

    该算法应用到大峡水电站二号机组的故障诊断中,结果表明,该方法能够对故障做出准确判别,分离各种故障类型。

    youdao

  • This algorithm is applied to fault diagnosis for unit no. 2 of the Daxia hydropower station. Results show that this method can help accurately identifying the faults and their categories.

    该算法应用到大峡水电站二号机组的故障诊断中,结果表明,该方法能够对故障做出准确判别,分离各种故障类型。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定