Change is outside the list of engineering quantity; supplied engineering geology datum and hydro-geological data don't agree with practical condition.
不属于工程量清单范围内的变化,提供的工程地质资料、水文地质资料与实际不符而增加的工程量。
The experiment datum indicates that this method can reduces the computed quantity greatly and guarantees accuracy of the target identification.
实验数据表明,该方法大大减少了计算量,保证了目标识别的准确度。
The experiment datum indicates that this method can reduces the computed quantity greatly and guarantees accuracy of the target identification.
实验数据表明,该方法大大减少了计算量,保证了目标识别的准确度。
应用推荐