• We should dam out feelings.

    我们控制自己的感情。

    youdao

  • We should dam out feelings.

    曾经无法控制自己。

    youdao

  • When the tide fall, water goes out through the dam, the turbines turn again.

    水下降时,水从大坝流出,再次带动涡轮机转动。

    youdao

  • At the height of the flood, engineers feared a bridge on the Pawtuxet was going to collapse, taking with it a nearby dam, which in turn could have taken out another dam.

    洪峰到来时,工程人员担心塔克西特河可能倒塌,冲垮附近的一座水坝堵塞另一座水坝。

    youdao

  • Afterwards some of us go canoeing out to the beavers' dam up the creek while the big guys stick around the camp to fish.

    早餐后,我和一些划船,划小河上游海狸;大汉们留在营地附近钓鱼。

    youdao

  • Some fish are radio-tagged, moved above a dam, and tracked to find out if they return to their birthplaces to spawn.

    有些水坝上活动的被安上了无线电标签,可以追踪查看它们是否返回出生地产卵

    youdao

  • As to your request, I do not think the beavers are aware that they must first fill out a dam permit prior to the start of this type of dam activity.

    关于要求并不认为这些海狸知道在开始这种建坝活动之前他们必须填表获得允许

    youdao

  • Years ago, the mountain village where they grew up had electricity for only several hours each evening, when water was let out of a nearby dam to turn a small turbine.

    年前他们生长的这个山村晚上有几个小时附近水坝一个小型涡轮。

    youdao

  • After three days of observation, they found out why the dam was sinking and took measures to stop it.

    经过观察他们找到水坝塌陷原因采取了措施制止

    youdao

  • The river rose and washed out the dam. The road has washed out five miles down the mountain.

    河水冲垮大坝山下坏的有五英里

    youdao

  • The genetic analysis for system error and lourse error of the prototype observed data of earth-rock dam is carried out.

    土石坝原型观测资料系统误差、粗的成因进行分析

    youdao

  • Can you work out how much it costs to build the dam?

    费用出来吗?

    youdao

  • If one looks at the Hoover dam being built, you can see all the, all the workmen out with their fedoras.

    如果有人见过大坝修建过程,发现所有工人都只戴着软呢帽

    youdao

  • The engineering geological drilling exploration for the Jinduicheng tailings dam area is carried out to serve the heightening design of enlarging its volume.

    金堆城尾矿为了进行加高设计尾矿库进行地质钻孔勘探

    youdao

  • On the basis of construction geology works, the engineering geology assessment is carried out for the dam base of Baiyekou Reservoir in this paper.

    施工地质工作基础上,对叶口水库工程面板堆石坝坝基进行工程地质评价

    youdao

  • There are several ways in data analysis, this article sums up some ways of qualitative analysis, and describes the different represent when the dam seepage is out of the way.

    渗流观测资料分析方法很多文章总结常用的几种定性分析方法,分析大坝渗流异常的不同表现形式。

    youdao

  • Therefore, it is significant meaning to fully recognize the character, to analysis and simulate the flow, to research and work out the control measure of the tailings dam leakage.

    因此充分认识尾矿渗漏特征分析模拟尾矿坝的渗流运动研究制订尾矿坝渗漏治理措施具有重要的理论意义实际意义。

    youdao

  • This paper presents several experimental method in arch dam modal of low elastic modulus and their evaluations. The peculiarities and applied ranges of them are also pointed out.

    本文探讨了拱坝模型试验中低模材料几种电测方法作出了评价,指出了各方法的特点适用范围

    youdao

  • According to dam body buried a number of thermometers, the method is put forward analyzing temperature field of dam body and corresponding program is worked out in this paper.

    针对坝体埋有一定数量温度计特点,根据热传导理论,以坝体边界、坝内温度计的测值为约束条件,采用有限单元分析坝体温度时空分布,研制了相应的计算程序.。

    youdao

  • The best roller compacted parameter is determined by roller compaction test. Filling and roller compaction are carried out strictly in accordance with dam filling techniques.

    通过碾压试验确定碾压参数。对填筑料、碾压等严格按照坝体填筑施工技术要求施工并严格进行质量检查控制。

    youdao

  • The questions were begging to come pouring out of my mouth like water spilling out of a tiny hole chiseled in the Hoover dam.

    忍不住发问一连串疑问,就像不断胡弗堤坝一个小孔溢流出来

    youdao

  • The safety monitoring system could give out the values of the hole water pressure, the change curve of pressure vs. time, and the soakage line of the dam body.

    系统根据需要给出孔隙压力,压力值时间变化曲线坝体浸润线

    youdao

  • The assessment is carried out on characteristics of engineering geology in dam foundation and main engineering geology problems on arch dam and treatment measures are taken.

    对该基础下第三系砾岩工程地质特征拱坝存在的主要工程地质问题进行评价针对其地质问题提出了工程处理措施。

    youdao

  • The results suggest that it is feasible to carry out maths modelling of the overflow dam flow with the maths model established in this paper.

    模型试验验证结果表明,采用本文建立数学模型对溢流坝水流进行数值模拟可行

    youdao

  • Maojianshan hydropower station has operated for 40 years safely. Two times of periodical inspection has been carried out, and the dam has assessed as normal one.

    毛尖山水电站安全运行40进行大坝安全定期检查工作,大坝被评定为正常坝。

    youdao

  • The system is decoupled into two subsystems, namely the upper dam site subsystem and the dam site Hukou subsystem, according to its nature. The flood routing is carried out with hydrology methods.

    根据系统的特点,将模型分解为三峡库区坝址至湖口大子系统,采用水文学方法进行洪水演进计算。

    youdao

  • The complete high pressure consolidation grouting was carried out in dam section of riverbed of Tongjiezi project under, complicated geological conditions.

    铜街子水电站复杂地质条件下,对河床坝段进行全面高压固结灌浆

    youdao

  • The optimization of laying out these structures, paths of flow jets and a water cushion pool for a high arch dam is first discussed systematically in this paper.

    本文首次系统地对拱坝坝身泄洪孔口、泄流过程以及下水布置优化问题进行了讨论

    youdao

  • The optimization of laying out these structures, paths of flow jets and a water cushion pool for a high arch dam is first discussed systematically in this paper.

    本文首次系统地对拱坝坝身泄洪孔口、泄流过程以及下水布置优化问题进行了讨论

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定