• The reservoir created by the backflow of the dam will extend 360 miles up river to Chongqing (" Chong-ching "), a distance equal to nearly half the length of California.

    大坝形成长达360英里(579公里)的水库延伸重庆距离为美国加利福尼亚州长度一半

    youdao

  • The length of the dam is a staggering 7235 meters and at its highest it is two hundred and twenty five meters.

    大坝长度惊人,达7235高度为225米。

    youdao

  • The reservoir that was formed behind the dam is over eighty kilometers in length.

    这座水坝蓄水库长达80多公里

    youdao

  • The observation of longitudinal horizontal displacement of an earth dam is to observe the relative strain of the length between two displacement points.

    土坝纵向水平位移观测观测两两位移长度应变值

    youdao

  • Through research, the problem was solved by adopting gravel pile method and setting reasonable dry beach length in front of the retaining dam.

    通过设计研究采用碎石振冲子坝前设置合理长度得以解决这些问题

    youdao

  • With the length of 6160m of the main and secondary earth dam, Nihe is a large reservoir.

    泥河水库大型平原水库,长度总计6160。

    youdao

  • To reduce the above deviation, the concept of rupture length is introduced into the fault-rupture model, but the attenuation is quite different from practical dam.

    为了克服上述偏差,断层-破裂模型引进破裂长度概念衰减实际资料出入较大。

    youdao

  • This paper introduces the boundary element method to study the affect of the blanket length for earth-rock dam on the infinite deep pervious foundation on the seepage of dam foundation.

    采用边界研究无限透水地基土石坝铺盖长度坝基渗流影响

    youdao

  • The effects of drainage clogging and dam height are most obvious, but dry beach length, permeability of phosphogypsum and anisotropic permeability are weaker.

    长度石膏透水性以及其各向异性等三种因素对坡稳定性影响相对较小。

    youdao

  • Effects of column length and buffer constitution on separation have been discussed. Anions in well water, dam water. tap water and snow water have been fast identified.

    考察洗脱液组成阴离子分离影响,对井水、自来水雪水中无机阴离子进行了快速分离。

    youdao

  • To avoid the Guiwu road being divagated, the right bank joint dam of the Jingnan WR pivotal project took some measures to shorten the joint dams length and decrease excavation.

    广西京南水利枢纽右岸接头避免公路改道采取缩短接头长度、减少开挖措施 ,使基建面置于风化强烈、工程地质条件差的岩体上。

    youdao

  • The results show that the dam slop is the most serious erosion belt in view of both gradient and slop length;

    通过试验示范调研分析,结果认为无论从坡度长的影响看,都属严重土壤侵蚀地带

    youdao

  • The results show that the dam slop is the most serious erosion belt in view of both gradient and slop length;

    通过试验示范调研分析,结果认为无论从坡度长的影响看,都属严重土壤侵蚀地带

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定