• The left training wall of TGP is situated downstream of the transition dam section between spillway and left intake dam.

    位于泄洪坝段左厂房坝段之间导墙坝段下游

    youdao

  • It's also suitable to be used in case of thick trash accumulation in front of the reservoir dam or the intake trash rack.

    适用于水库进水口拦污栅污物堆积情况

    youdao

  • It's also suitable to be used in case of thick trash accumulation in front of the reservoir dam or the intake trash rack.

    适用于水库进水口拦污栅污物堆积情况

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定