• The analysis of a dam foundation is carried out.

    坝基变形进行了分析

    youdao

  • By curtain grouting, the dam foundation is reinforced and the leakage is reduced.

    经过坝基防渗补强灌浆加强坝基质量,减少了渗漏

    youdao

  • Uncertainty may exist in dealing with the mechanism of local uplift anomaly on dam foundation.

    坝基局部扬压力异常机理分析通常存在不确定性

    youdao

  • The article aims to solve the problem of the dam foundation seepage of the Gongshang reservoir.

    本文研究工作是解决弓上水库坝基渗漏问题而展开的应用研究。

    youdao

  • The experience of Xin'anjiang dam foundation grouting is of reference value to similar projects.

    工程坝基固结灌浆补强处理经验其它类似大坝补强工程具有一定的参考价值

    youdao

  • Seepage and seepage-pressure are important factors which influence the stability of dam foundation.

    渗流、渗压影响坝基稳定重要因素

    youdao

  • The rock mass of dam foundation of Zaoshi Hydroproject is mainly fine silicarenite with soft layers.

    皂市水利枢纽坝基岩体主要为石英砂岩夹软弱夹层。

    youdao

  • The case study of dam foundation seepage exploration of Chongqing Reservoir shows the great effects.

    崇青水库坝基渗漏勘查收到良好的效果。

    youdao

  • The contrast test in made with clay solidification slurry and cement grant in permeable dam foundation.

    粘土固化泥浆坝基强透水地层做了高喷截渗时比试验

    youdao

  • The dam foundation engineering geological problem is the bed rock deep weathering in Malutang water complex.

    马鹿水利枢纽坝基主要工程地质问题就是基岩风化问题。

    youdao

  • Concrete dam displacement, especial for dam foundation or arch support, is an important target to judge the safety.

    混凝土大坝变形尤其是坝基座的变形,衡量工程安全与否一个重要指标

    youdao

  • The relationship between in situ stress and stability of dam foundation rock is less considered in dam construction.

    地应力坝基岩体稳定关系建设研究得较少的一个课题。

    youdao

  • The data from a large - scale consolidation test are important for the stress and strain analysis of a dam foundation.

    大型固结试验获得的参数,坝基应力应变分析重要数据此项试验研究工作,在东北地区尚未广泛开展。

    youdao

  • The first concrete face and its strengthening face are destroyed by the inverse seepage water pressure on dam foundation.

    大坝期混凝土面板一期面板的补强面板分别遭受坝基渗水压力破坏

    youdao

  • The geological condition of Chencun Dam foundation is complicated, and the curtain of foundation has been grouted a few times.

    陈村大坝坝基地质条件复杂,对坝基帷幕进行了多次灌浆补强。

    youdao

  • The effect of increasing drainage depth on seepage discharge and uplift of dam foundation is studied when curtain depth is fixed.

    帷幕深度一定分析了排水孔深度变化流量扬压力影响

    youdao

  • The authors noted “we shall not consider the possibility of a large differential movement occurring in a fault transversing the dam foundation.

    作者说:“我们不要再考虑横跨大坝基部断裂带地层可能发生运动差别

    youdao

  • The plane FEM was used for analysing the displacements and stresses in the dam and the dam foundation before and after dam foundation treatment.

    应用平面有限元法对坝基处理前后坝体坝基的变位应力进行计算和分析

    youdao

  • Deformation modulus for dam foundation rock must be determined reasonably when stress in dam is analyzed with arch and cantilever trial load method.

    在拱梁坝体应力分析时,需要合理确定坝基岩体变形量值。

    youdao

  • In strengthening of Baitukeng Reservoir, the dam slope was paved with composite geomembrane, while the dam foundation was paved with plastic film inv.

    白土坑水库加固铺设复合土工膜,坝基进行垂直并将两者连为一体。

    youdao

  • Several conditions of the dewatering hole on the fractured rock dam foundation are analyzed by means of the seepage principle of rock mass fracture network.

    采用岩体裂隙网络渗流原理裂隙岩体坝基中设置排水孔各种情况进行了分析

    youdao

  • A combined measure of paving compound film on the upstream surface of dam and setting up vertical anti-seepage in dam foundation is adopted to treat leakage.

    因此一般采用上游铺设复合土工坝基垂直防渗措施进行防渗漏处理。

    youdao

  • Dam foundation of Shapotou Water Control project is mainly composed of soft rock and the rock body deformation is the major geological problem for this project.

    沙坡头水利枢纽坝基以为主岩体变形问题已本工程的一个主要地质问题

    youdao

  • Rock masses classification and gradation for dam foundation is one of the important engineering geological issues in Lixianjiang hydropower project, Yunnan, China.

    云南李仙江石门坎水电站坝基岩体分级研究该坝址工程地质问题研究重要内容之一。

    youdao

  • It can be proved that the non linear seepage law can not be approximately regarded as the linear seepage law in analysis of non Darcy seepage through dam foundation.

    可以看出坝基达西渗流分析不能采用线性渗流规律近似代替非线性渗流规律。

    youdao

  • In consideration of the rock characteristics, formation, rock structure, unloading and weathering, the quality of rock body in the dam foundation has been classified.

    考虑岩性构造岩体结构卸荷风化等诸因素后,对大坝坝基岩体进行岩体质量类别划分。

    youdao

  • This paper introduces the rock acoustic wave test in protective layer of dam foundation in Fenhe Secondary Reservoir and conducts more detailed analysis on the test result.

    文中介绍了汾河基坑保护层开挖对基岩的声波测试,着重测试结果进行详细分析

    youdao

  • The assessment is carried out on characteristics of engineering geology in dam foundation and main engineering geology problems on arch dam and treatment measures are taken.

    对该基础下第三系砾岩工程地质特征拱坝存在的主要工程地质问题进行评价针对其地质问题提出了工程处理措施。

    youdao

  • The application of the model to dam foundation ageing analysis of the right section of the Xin'anjiang Dam shows that the model is reliable, practical, and fast in calculation.

    模型应用新安江大坝坝段坝基老化分析,结果表明建立的模型可靠实用,求解速度较快

    youdao

  • The application of the model to dam foundation ageing analysis of the right section of the Xin'anjiang Dam shows that the model is reliable, practical, and fast in calculation.

    模型应用新安江大坝坝段坝基老化分析,结果表明建立的模型可靠实用,求解速度较快

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定