Therefore the sliding stability of dam base along weak interlayer is concerned.
因此坝基沿软弱夹层结构面的抗滑稳定性为人们所关注。
According to the analysis results, it is imperative that the stilling basin below dam is applied to protect dam base from erosion.
由分析结果可知,从风险和经济两方面看来,二滩大坝应用坝下水垫塘保护大坝安全是必要的。
The mineral is dissolved, eroded and displaced by seepage water from the dam base, finally becomes exudation under oxidation and reduction.
矿物在坝基渗压水作用下溶解、侵蚀与迁移,在氧化还原条件下转化形成溢出物。
On the basis of construction geology works, the engineering geology assessment is carried out for the dam base of Baiyekou Reservoir in this paper.
在施工地质工作的基础上,对柏叶口水库工程面板堆石坝坝基进行了工程地质评价。
The lap of diaphragm wall with curtain grouting is the weak point of dam base seepage control, so in construction process the lap quality must be ensured.
墙幕的搭接处是整个坝基防渗的薄弱点,施工中要保证搭接质量。
The assessment contents include dam base seepage, seepage stability, earthquake, seepage control treatment and base treatment measures etc.
评价内容包括坝基渗漏,渗漏稳定,地震,防渗处理,基础处理措施等。
The optimization design results of the dam base excavation outline and the type and body shape of the arch dam of the Xiakou Hydraulic Project are introduced.
介绍了峡口水利水电枢纽工程技施设计阶段坝基开挖线、拱坝坝型和拱坝体型优化设计成果。
The drilling rig is mainly used in soil and rock anchoring, consolidation of road base, dam base and retaining wall, and blasting hole drilling and jet-grouting.
该钻机主要用于土、岩锚杆、路基、坝基、挡土墙加固、爆破孔等钻孔工程以及高压旋喷孔的施工。
The infiltration protection wall of deepest of over 80 meters at Xiaolangdi dam is the key project to control infiltration in the sand and gravel layer at dam base.
小浪底主坝防渗墙是坝基砂砾石覆盖层渗流控制的关键工程,最深达80多米。
Stress concentration from explosion excavation of dam base surface and effect from explosion were the lithology conditions of intensive unloading and relaxation of dam base rock.
坝基面爆破开挖的应力集中和爆炸作用影响是坝基岩体卸荷松弛强烈的岩石力学环境条件。
So it is instructive to obtain an accurate and reasonable mechanical parameter of these layers, especially in selecting a good dam base and evaluating the stability of the dam base.
准确、合理的选取其力学参数对大坝建基面的选取及未来坝基抗滑稳定性具有重大意义。
The horizontal construction joint treatment of Ertan Arch dam concrete, concrete placement of dam base and connection efficiency examination between concrete joints and concrete with dam base.
介绍了二滩拱坝混凝土水平施工缝处理及坝基面混凝土浇筑和检查混凝土缝间、混凝土与坝基结合的效果。
The horizontal construction joint treatment of Ertan Arch dam concrete, concrete placement of dam base and connection efficiency examination between concrete joints and concrete with dam base.
介绍了二滩拱坝混凝土水平施工缝处理及坝基面混凝土浇筑和检查混凝土缝间、混凝土与坝基结合的效果。
应用推荐