• The cause of concrete fissure on face rock fill dam of Dongba Hydropower Station is studied, and it is determined to use SR sealing material to solve the problem.

    通过对洞巴水电站面板堆石坝混凝土裂缝原因进行详细分析,确定采用SR止水材料处理措施。

    youdao

  • Belt coveyer and distributing material spiral mac hi nes and implements were discussed and ap-plied to concrete plate casting of ro ck-fill dam.

    研制了皮带螺旋布料机具应用鱼跳面板堆石坝混凝土面板浇筑中。

    youdao

  • It seems that the seismic reflection method is an efficient tool for delineation of earth-fill dam structure and for estimation of material properties.

    因此地震反射方法描述土坝结构评估材料特性有效工具

    youdao

  • In most of soil constitutive models, the soil is taken as isotropic material. This may result in significant error in stress and deformation computation for concrete slab in rock-fill dam.

    土体模型一般都将土体作为各向同性材料,应用于混凝土面板堆石坝应力变形计算时常带来不小误差本文双曲线模型例剖析了计算中存在的问题。

    youdao

  • In most of soil constitutive models, the soil is taken as isotropic material. This may result in significant error in stress and deformation computation for concrete slab in rock-fill dam.

    土体模型一般都将土体作为各向同性材料,应用于混凝土面板堆石坝应力变形计算时常带来不小误差本文双曲线模型例剖析了计算中存在的问题。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定