Introduced a new implementing method for loading cutting part with high power of shearer, and expound working theory of loading test, main components and main technical feature.
介绍了采煤机大功率截割部加载试验的一种新的实现方法,同时阐述了加载试验的工作原理、主要组成部分和主要技术特点。
The rest of the time would be spent on waiting, moving, setting up, loading, unloading, inspecting the part, setting speeds and feeds, and changing cutting tools.
其余的时间则完全用在等待, 运送,配置,装卸,检验,调速与改变电切工具上。
Aim to the problem of cutting part with shearer at the mechanical repair workshop, the loading test bed for shearer cutting part undergoing maintenance is manufactured.
针对矿修车间的采煤机截割部的加载问题,研制开发面向维修的采煤机截割部加载试验台,对维修后的采煤机截割部进行加载试验。
Introduced a new implementing method for loading cutting part with high power of shearer, and expound working theory of loading test, main components and main technical feature.
介绍采煤机牵引部直流电力回馈加载试验台的组成、工作原理及特点,加载方法和控制,测试数据的采集、输出及显示。
Introduced a new implementing method for loading cutting part with high power of shearer, and expound working theory of loading test, main components and main technical feature.
本文描述了针对高速运动机构的加载试验系统,介绍了不同的加载方式的特点,描述了采用气动加载的原理,误差分析以及最终实现的系统。
Introduced a new implementing method for loading cutting part with high power of shearer, and expound working theory of loading test, main components and main technical feature.
本文描述了针对高速运动机构的加载试验系统,介绍了不同的加载方式的特点,描述了采用气动加载的原理,误差分析以及最终实现的系统。
应用推荐