• Introduced a new implementing method for loading cutting part with high power of shearer, and expound working theory of loading test, main components and main technical feature.

    介绍了采煤机大功率截加载试验一种新的实现方法同时阐述了加载试验的工作原理主要组成部分主要技术特点

    youdao

  • The rest of the time would be spent on waiting, moving, setting up, loading, unloading, inspecting the part, setting speeds and feeds, and changing cutting tools.

    其余时间完全等待, 运送,配置装卸检验调速改变电切工具上。

    youdao

  • Aim to the problem of cutting part with shearer at the mechanical repair workshop, the loading test bed for shearer cutting part undergoing maintenance is manufactured.

    针对车间采煤机截加载问题研制开发面向维修的采煤机截部加载试验台,对维修后的采煤机截割部进行加载试验

    youdao

  • Introduced a new implementing method for loading cutting part with high power of shearer, and expound working theory of loading test, main components and main technical feature.

    介绍采煤机牵引部直流电力回馈加载试验台的组成工作原理特点,加载方法控制,测试数据的采集、输出及显示。

    youdao

  • Introduced a new implementing method for loading cutting part with high power of shearer, and expound working theory of loading test, main components and main technical feature.

    本文描述了针对高速运动机构加载试验系统,介绍了不同的加载方式的特点,描述了采用气动加载的原理,误差分析以及最终实现的系统。

    youdao

  • Introduced a new implementing method for loading cutting part with high power of shearer, and expound working theory of loading test, main components and main technical feature.

    本文描述了针对高速运动机构加载试验系统,介绍了不同的加载方式的特点,描述了采用气动加载的原理,误差分析以及最终实现的系统。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定